Skip to main content
CityRuleLookup

North Charleston, SC Environmental Rules: Stormwater Management (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Applies to lots
200 feet deep or less
Minimum slope
0.8% to drainage facility
Approved outlets
swale, ditch, gutter
Larger tracts
must be 'properly drained'

Summary

New subdivision lots 200 feet deep or less must drain to an approved swale, ditch or gutter at a minimum eight-tenths of one percent slope so water doesn't pool.

All lots not exceeding two hundred (200) feet in depth shall be provided with means for positive drainage and shall have a slope of not less than eight-tenths of one per cent (0.8 of 1%) to an approved swale, ditch, gutter or other type of approved drainage facility. Larger tracts of land shall be properly drained.(g)Fire hydrants. In all subdivisions of over five (5) lots, fire hydrants shall be required. Such hydrants shall be constructed in conformance with the standards of the commissioners of public works and the fire department. In residential subdivisions, hydrants shall be located within eight hundred (800) feet of each building site. In commercial and industrial subdivisions, hydrants shall be located within five hundred (500) feet of each building site.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 75).

Full Breakdown

North Charleston Code § 18-54(f), part of the subdivision regulations' utility and drainage improvements article, requires every lot not exceeding 200 feet in depth to be graded with positive drainage, a minimum slope of eight-tenths of one percent (0.8%), to an approved swale, ditch, gutter or other approved drainage facility. Larger tracts must also be properly drained. The requirement applies to new subdivisions at the time of plat approval and construction, ensuring stormwater moves off individual lots rather than ponding.

Violations & Fines

Plats or lot grading that fail to provide the required 0.8% positive drainage slope are noncompliant with the subdivision ordinance and can be rejected or held up at final plat approval and construction inspection.

Frequently Asked Questions

Does North Charleston require a minimum drainage slope for new lots?
Yes: lots up to 200 feet deep need at least 0.8% slope to an approved swale, ditch or gutter under § 18-54(f).
Who enforces lot drainage in a new subdivision?
The city engineer, who must approve road and drainage plans before final plat and construction under §§ 18-22 and 18-54.

Sources & Official References

Other rules in North Charleston

All North Charleston rules

Compare North Charleston to another location·View the South Carolina environmental rules overview

Get notified when Stormwater Management in North Charleston, SC changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Stormwater Management in Nearby Cities

How other cities in Charleston County handle stormwater management.

Charleston, SC
Some Restrictions