Significant Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Governing section
Code of Ordinances Section 94.02
Adopted
Ordinance 1070, passed 5-4-94
Covers
canals, culverts, catch basins, weirs, flood gates
Exception
material permitted and authorized by city
Penalty
up to $500 fine or 90 days jail
Continuing violation
each day is a separate offense
Enforcer
Code Enforcement Officer, Section 31.04

Summary

Pembroke Pines Code of Ordinances Section 94.02 bars anyone from placing material in a canal, culvert, catch basin, weir, or other drainage way that would alter, impede, or block stormwater flow, unless the city has permitted the work. Unpermitted obstruction is a code violation enforced citywide by the Code Enforcement Officer.

No person, firm, corporation or other entity shall place or cause to be placed in any surface or subsurface drainage way, including but not limited to ponds, lakes canals, channels, streams, culverts, drain pipes, manholes, catch basins, headwalls, pumps, weirs, flood gates and other drainage bodies, lines and structures, any material of any form, type or nature, the placement of which would alter, impede, block or otherwise detrimentally effect the rate of flow of water through the drainage way, except if the material has been permitted and authorized by the city.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2026 S-61: Supplement contains: Local legislation current through Ord. 2056, passed 12-11-25).

Full Breakdown

02, adopted by Ordinance 1070 on May 4, 1994, is the city's operative drainage-obstruction rule. " Placing any material there, of any form, type or nature, that would alter, impede, block or otherwise detrimentally affect the rate of flow is unlawful unless the city has first permitted and authorized the work. That permit requirement means fences, fill, landscaping timbers, dumped debris, or a homeowner's makeshift dam across a drainage swale or canal bank all need city sign-off before they go in, not after. 01, which separately makes it unlawful to dump or bury refuse, garbage, or debris on the bank of any river, stream, or waterway, or to do any act that pollutes or tends to pollute the waters of a watercourse or pool, so both blocking a drainage way and fouling it are covered under the same General Provisions of Chapter 94 (Garbage, Rubbish, Litter, and Weeds).

04, whose duty is "to enforce all provisions of the code" and who is "granted the power of arrest in the same manner and to the same degree as the police officers of the city" along with authority to issue summons for code violations. Property owners along the city's canal network, common throughout Pembroke Pines' platted subdivisions, are the group most exposed: altering a bank, adding a culvert, or backfilling a swale on private property abutting a canal easement without city authorization triggers this section even if no flooding has yet occurred, because the standard is whether the placement would alter or impede flow, not whether it has already caused damage.

Violations & Fines

Section 94.02 carries no stand-alone penalty clause, so it falls under the citywide general penalty at Section 10.99: a fine of not more than $500, imprisonment for up to 90 days, or both, for any code violation lacking its own specified penalty. Section 10.99(B) makes each day the obstruction remains in place a separate offense, so an unpermitted blockage left in a canal or catch basin for a week can multiply into several distinct violations rather than a single fine.

Frequently Asked Questions

Can I add fill or a fence along a drainage canal on my Pembroke Pines property?
Not without city authorization. Section 94.02 prohibits placing any material in a drainage way, including canals, that would alter, impede, or block stormwater flow unless the city has permitted the work first, so fill, fencing, or landscaping in a canal easement needs sign-off before installation.
What structures count as a drainage way under Pembroke Pines' ordinance?
Section 94.02 lists ponds, lakes, canals, channels, streams, culverts, drain pipes, manholes, catch basins, headwalls, pumps, weirs, and flood gates as covered drainage bodies, lines and structures, so the ban applies broadly across the city's stormwater infrastructure, not just canals.
What happens if I block a city drainage system without a permit?
Because Section 94.02 has no specific penalty of its own, the citywide general penalty in Section 10.99 applies: a fine up to $500, up to 90 days imprisonment, or both, and each day the obstruction continues counts as a separate offense under Section 10.99(B).
Who enforces the drainage obstruction rule in Pembroke Pines?
The Code Enforcement Officer, a position established under Section 31.04, has the duty to enforce all provisions of the code, holds arrest power equivalent to a police officer, and can issue summons for violations including unpermitted drainage obstructions.

Sources & Official References

Other rules in Pembroke Pines

All Pembroke Pines rules

Florida rules heatmap·Compare Pembroke Pines to another location·View the Florida environmental rules overview

Get notified when Stormwater Management in Pembroke Pines, FL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Stormwater Management in Nearby Cities

How other cities in Broward County handle stormwater management.

Hollywood, FL
Some Restrictions
Pompano Beach, FL
Some Restrictions
Miramar, FL
Some Restrictions
Coral Springs, FL
Some Restrictions
Fort Lauderdale, FL