Skip to main content
CityRuleLookup

Summit County, OH Environmental Rules: Stormwater Management (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Governing chapter
Summit County Code Ch. 943
Applies to
Unincorporated county development/redevelopment
Design storm
100-year, 24-hour storm event
Minimum freeboard
One foot above peak stage
Concept plan fee
$250.00
Civil fine range
$100 to $500 per day
Enforcing official
County Drainage Engineer

Summary

Summit County's Comprehensive Storm Water Management chapter requires any development or redevelopment in the unincorporated county to control runoff volume, rate and quality. The County Drainage Engineer reviews plans, and storm water ponds and conveyance systems must be designed to prevent structure flooding during a 100-year, 24-hour storm event.

City-specific rules exist: Akron has its own stormwater management rules that differ from Summit County's county-level regulations. If you live in Akron, check the city-specific page instead.

The storm water system, including water management practices for storage, treatment and control, and conveyance facilities, shall be designed to prevent structure flooding during the 100-year, 24-hour storm event; to maintain predevelopment runoff patterns, flows, and volumes... All storm water pond and storm conveyance designs must provide a minimum of one (1) foot freeboard above the projected peak stage within the facility during the 100-year, 24-hour storm.

Full Breakdown

Summit County Codified Ordinances Chapter 943, Comprehensive Storm Water Management, governs any owner who develops or redevelops property within the unincorporated areas of the county (Sec. 01). The chapter is administered by the County Drainage Engineer, who reviews Comprehensive Storm Water Management Plans and enforces performance standards under Sec. 09. Those standards require the storm water system, including storage, treatment, control and conveyance facilities, to be designed to prevent structure flooding during the 100-year, 24-hour storm event, to maintain predevelopment runoff patterns, flows and volumes, and to provide a minimum of one foot of freeboard above the projected peak stage in any storm water pond or conveyance channel during that same storm event.

Practices may not disturb riparian areas except for watercourse restoration compliant with Chapter 937, and storm water management practices serving multiple lots in a subdivision must generally sit on a separate lot maintained by an entity of common ownership, per Sec. 09(a)(7). Applicants pay a $250 fee at the Concept Plan Meeting (Sec. 14(a)), plus a deposit covering at least 50% of the County Drainage Engineer's estimated review, filing and inspection cost, replenished whenever it drops to 10% of the original estimate. Projects also post a performance and maintenance bond under Sec.

15, released only after 80% of subdivision lots are complete, the whole project has been stabilized for three years, an as-built inspection is done, and a signed Inspection and Maintenance Agreement is on file. Appeals of any Drainage Engineer action go to Summit County Council within 90 days, with further appeal to the Summit County Court of Common Pleas (Sec. 18). This chapter applies only to the unincorporated county; Akron, Cuyahoga Falls, Barberton, Stow, Hudson and other incorporated cities enforce their own stormwater codes.

Violations & Fines

Violating Chapter 943 or any permit issued under it draws a civil fine of $100 to $500, with each day of continued violation a separate offense (Sec. 943.17(c)). After an uncorrected 30-day notice of violation, the County Drainage Engineer issues a second notice; after 15 more days of noncompliance, a stop work order can issue and the county may perform repairs and bill the responsible party. The Building Standards Department may also withhold occupancy certificates, and the Summit County Prosecutor may seek an injunction.

Frequently Asked Questions

Who enforces stormwater rules in unincorporated Summit County?
The County Drainage Engineer, a role filled by the County Engineer or a designee of Summit County Council, reviews Comprehensive Storm Water Management Plans, conducts inspections, and issues notices of violation and stop work orders under Chapter 943.
What storm event must a stormwater system handle?
Under Sec. 943.09, storage, treatment, control and conveyance facilities must be designed to prevent structure flooding during a 100-year, 24-hour storm and to maintain predevelopment runoff patterns, flows and volumes on the site.
What does the initial stormwater review cost?
Applicants pay $250 at the Concept Plan Meeting under Sec. 943.14(a), then a deposit covering at least half of the County Drainage Engineer's estimated review, filing and inspection cost before the Preliminary Plan review begins.
Does this chapter apply inside Akron or Cuyahoga Falls?
No. Chapter 943 governs only the unincorporated areas of Summit County; incorporated cities like Akron, Cuyahoga Falls, Barberton, Stow and Hudson enforce their own separate stormwater ordinances.

Sources & Official References

Other rules in Summit County

All Summit County rules

Compare Summit County to another location·View the Ohio environmental rules overview

Get notified when Stormwater Management in Summit County, OH changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Stormwater Management in Cities Across Summit County