Skip to main content
CityRuleLookup

Port Townsend, WA Environmental Rules: Stormwater Management (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Design standard
DOE 2005 Stormwater Mgmt Manual
Drainage plan trigger
40%+ new impervious coverage
Administering agency
Public Works Director
Enforcement
Chapter 1.20 PTMC penalties
Utility established
PTMC 13.31.020, since 1986

Summary

Port Townsend requires all developments to meet Washington's 2005 Stormwater Management Manual for Western Washington, submit a drainage plan, and keep runoff on natural drainage paths under PTMC 13.32.

All developments shall comply with the Department of Ecology's February 2005 Stormwater Management Manual for Western Washington ("2005 SWMM-WW"), except for the following: Section 2.6 – Optional guidance, relating to financial liability and off-site analysis and mitigation, city engineering design standards, city stormwater master plan, and adopted drainage basin plans for all clearing and grading activities, for erosion control during construction and for permanent drainage system improvements.

View official code

Official source re-checked September 8, 2026: no newer edition of the code had been published (publisher’s edition: current through Ordinance 3364, passed May 18, 2026).

Full Breakdown

Under PTMC 13.32.010, every development in Port Townsend must comply with the Department of Ecology's 2005 Stormwater Management Manual for Western Washington, the city's engineering design standards, and its stormwater master plan for clearing, grading, erosion control, and permanent drainage improvements. Surface water must enter and exit a site at its natural, pre-development locations, with no diversion. PTMC 13.32.020 requires a drainage plan for grading permits, subdivisions, rezones, and building permits adding 40 percent or more impervious coverage. The public works director administers the stormwater utility created under PTMC 13.31.020 and enforces the code through Chapter 1.20 PTMC.

Violations & Fines

Violating the stormwater code is a public nuisance under PTMC 13.31.070 and 13.31.080, enforceable through Chapter 1.20 PTMC with correction orders, stop-work orders, abatement, and civil or criminal penalties.

Frequently Asked Questions

Does Port Townsend require a stormwater/drainage plan for building permits?
Yes. PTMC 13.32.020 requires a drainage plan for building permits adding 40% or more impervious coverage, plus grading, subdivision, rezone, and shoreline permits.
What stormwater design standard applies in Port Townsend?
The city requires compliance with the Department of Ecology's 2005 Stormwater Management Manual for Western Washington, plus city engineering design standards, per PTMC 13.32.010.
Who enforces Port Townsend's stormwater rules?
The public works director enforces the stormwater code under PTMC 13.31.070, with violations treated as nuisances subject to Chapter 1.20 PTMC penalties.

Sources & Official References

Other rules in Port Townsend

All Port Townsend rules

Compare Port Townsend to another location·View the Washington environmental rules overview

Get notified when Stormwater Management in Port Townsend, WA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.