Pocatello, ID Fence Regulations: Fence Permit Requirements (2026)
Key Facts
- Permit required
- Before any fence construction, citywide
- Issued by
- Building Department
- Fee
- Set annually by City Council resolution
- Application
- Site plan with dimensions, materials, height
- Owner liability
- Owner must confirm permit even if contractor builds it
Summary
No one may erect or construct a fence anywhere in the City of Pocatello without a permit from the Building Department issued before construction starts. A contractor can hold the permit in their own name, but hiring one does not relieve the property owner of the duty to confirm a permit exists first. The permit fee is set annually by City Council resolution.
15.28.010: PERMIT REQUIRED; FEE: No person shall erect or construct, or cause to be erected or constructed, any fence within the city without having been issued a permit by the building department prior to such erection or construction. If the fence is constructed by a contractor, the permit may be issued in his name; however, nothing in this chapter shall relieve the person hiring the contractor of the obligation to ascertain that a permit has been issued prior to construction. The fee for construction of a fence shall be set annually by resolution of the city council.
Full Breakdown
Section 15.28.010 of Chapter 15.28, Fence Construction, bars anyone from erecting or constructing, or causing to be erected or constructed, any fence within the city without a permit from the Building Department issued before the work starts. If a contractor builds the fence, the permit may be issued in the contractor's name, but section 15.28.010 is explicit that this does not relieve whoever hired the contractor of the obligation to make sure a permit has actually been issued before construction begins, so the property owner carries the compliance risk either way.
The fee for building a fence is set annually by City Council resolution rather than fixed in the code text. Section 15.28.020 spells out what the application needs: it goes to the Building Department accompanied by the section 15.28.010 fee, and the Department issues the permit once it approves a site plan. That site plan must show the names, addresses, and phone numbers of the property owner and fence contractor; the project address; a statement of the materials to be used; and a diagram with the property lines and dimensions of the site plus the proposed fence location, the length of each fence line, the height of each section, and where materials change from section to section.
Because height and setback placement are built into the application diagram, the Building Department is effectively checking the numeric limits in section 15.28.030, including the 7-foot maximum height and the reduced height allowed within front and side setbacks, at the permit stage rather than only after the fence goes up.
Violations & Fines
The code does not print a specific fine for building without a permit in Chapter 15.28 itself; compliance runs through the Building Department, which reviews the site plan required by section 15.28.020 before issuing a permit under section 15.28.010. Requests to deviate from the fence rules go through the minor exception process or the construction board of appeals and review under section 15.28.040, not by skipping the permit step.
Frequently Asked Questions
Does hiring a fence contractor cover the permit requirement?
What has to be in a Pocatello fence permit application?
Is there a standard fee for a Pocatello fence permit?
Sources & Official References
Other rules in Pocatello
Compare Pocatello to another location·View the Idaho fence regulations overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.