St. Peters, MO Fence Regulations: Fence Permit Requirements (2026)
Key Facts
- No-permit districts
- R-1, R-1A, R-2, R-4, A-1
- Permit required
- R-3, Commercial, and Industrial districts
- Permit fee cap
- $50 building permit
- Electric fence exemption
- Exempt under RSMo Section 67.301
- Governing section
- Municipal Code Section 405.360(B)(1), (F)(1)
Summary
In the City of St. Peters, Missouri, no permit is required to build, alter, or replace a fence in most residential and agricultural districts. Section 405.360(F)(1) reverses that default for multi-family "R-3" developments, commercial "C" districts, and industrial "I" districts, where a building permit capped at fifty dollars must be obtained before the fence goes up.
1. No permit shall be required for the erection, installation or alteration of any fence within the City of St. Peters except as otherwise required in this Section. ... ... F. Fence Permit In All "R-3", "C" (Commercial) And "I" (Industrial) Districts. 1. For all fences installed within an "R-3(A)", "R-3(8)", a multiple-family development within a Planned Urban District (PUD), "C", or "I" District, a building permit, not to exceed fifty dollars ($50.00), shall be obtained prior to installation of the fence.
Full Breakdown
Section 405.360(B)(1) sets the City's baseline rule: no permit is required for erecting, installing, or altering any fence within the City of St. Peters, except as otherwise required elsewhere in the same Section. Subsection F carves out that exception. For any fence installed within an "R-3(A)" or "R-3(B)" multiple-family district, a multiple-family development inside a Planned Urban District, a "C" Commercial district, or an "I" Industrial district, Section 405.360(F)(1) requires a building permit before the fence is installed, and caps the permit fee at fifty dollars.
Electrified fences are carved out of even that permit requirement under Missouri Statute Section 67.301, RSMo, but the property owner must still meet City rules on aesthetics, access to public rights-of-way, sidewalks, and utility easements, structural soundness, and drainage impact. Wherever a permit applies or not, the same general standards in Subsection B still govern: fences are capped at six feet unless a district rule says otherwise, must be finished within six months of the start of construction, must be kept in good condition with damaged boards replaced and rust removed, and may not be electrified except as Missouri Statutes 67.301 and 67.494 allow. The Planning, Community and Economic Development Department administers fence permits and enforces these standards through its Neighborhood Preservation code enforcement staff.
Violations & Fines
Building a fence without the required permit in an "R-3," "C," or "I" district, or otherwise violating Section 405.360, is an ordinance violation under Section 405.815 of the St. Peters Municipal Code. A first offense is punishable by a fine of ten to two hundred fifty dollars per day the violation continues, or up to ten days in jail, or both; repeat violations at the same address raise the fine to one hundred to five hundred dollars per day.
Frequently Asked Questions
Do I need a permit to put up a fence in St. Peters?
Which districts actually require a fence permit?
How much does the St. Peters fence permit cost?
What happens if I skip a required fence permit?
Sources & Official References
Other rules in St. Peters
Compare St. Peters to another location·View the Missouri fence regulations overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.