Bartow County, GA Fence Regulations: Retaining Walls (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit trigger
Over 3 ft exposed height
Lower trigger with surcharge
Over 2 ft exposed height
Required with permit
Site plan plus engineer-stamped calculations
Tiered walls
Treated as one wall if offset < 2x height
Citation
Bartow County Code § 18-131

Summary

A retaining wall over three feet of exposed height, or over two feet if it supports a surcharge, needs a Bartow County building permit under Code § 18-131. The application must include a site plan and construction details with structural calculations stamped by a professional engineer.

These county ordinances apply to unincorporated areas of Bartow County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

(a)Permit required. A building permit shall be required for any retaining wall that exceeds three feet in exposed wall height, or exceeds two feet in exposed wall height and supports a surcharge. A building permit application shall require a site plan showing the location, extent, and height of the retaining wall in relations to any building structure, pool, property lines, and public utility easements. It shall also require complete construction details of the retaining wall, and structural calculations for the wall, both stamped and signed by a professional engineer.

Full Breakdown

Bartow County Code § 18-131(a) sets the trigger for when a retaining wall needs a building permit: any wall exceeding three feet of exposed wall height, or exceeding two feet of exposed wall height when it supports a surcharge, a vertical load beyond the retained soil itself, such as sloping backfill, a structure's footing, vehicle loads, or a solid fence attached to the wall. Exposed wall height is defined in § 18-131(b) as the vertical distance from the finish grade at the bottom of the wall to the finish grade at the top, not counting the wall and footing depth below grade.

When a permit is required, the application must include a site plan showing the wall's location, extent, and height in relation to any building, pool, property line, and public utility easement, plus complete construction details and structural calculations stamped and signed by a professional engineer. Section 18-131(c) also addresses tiered retaining walls, two or more short walls offset from one another instead of a single tall wall: if the walls are not offset by at least twice the exposed height of the lower wall, the county treats them as a single wall for permit purposes, so two three-foot walls set only two feet apart are treated as one six-foot wall and require a permit and engineering. Bartow County Building Inspections administers the permit under the general permitting authority of §§ 18-117 and 18-161.

Violations & Fines

Building a retaining wall over the permit threshold, more than three feet exposed, or more than two feet with a surcharge, without first obtaining a Bartow County permit and engineer-stamped plans violates § 18-131. Noncompliant work can draw a citation, stop-work order, or other civil remedy from the building official under § 18-116, and starting the wall before the permit issues adds a 100 percent penalty on the usual permit fee under § 18-253.

Frequently Asked Questions

At what height does a retaining wall need a permit in unincorporated Bartow County?
A permit is required once the exposed wall height exceeds three feet, or exceeds two feet if the wall supports a surcharge such as sloping backfill, a structure's footing, or vehicle loads, under Bartow County Code § 18-131(a). The application needs a site plan and structural calculations stamped by a professional engineer.
Can I avoid the permit by building two shorter walls instead of one tall wall?
Not if the walls are stacked too close together. Section 18-131(c) treats tiered walls as a single wall for permit purposes unless they are horizontally offset by at least twice the exposed height of the lower wall, so two closely spaced three-foot walls are treated as one six-foot wall requiring a permit.
What has to be stamped by an engineer?
The retaining wall's construction details and structural calculations must be stamped and signed by a professional engineer as part of the permit application, along with a site plan showing the wall's location and height relative to buildings, pools, property lines, and utility easements, per § 18-131(a).

Sources & Official References

Other rules in Bartow County

All Bartow County rules

Compare Bartow County to another location·View the Georgia fence regulations overview

Get notified when Retaining Walls in Bartow County, GA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.