Skip to main content
CityRuleLookup

Oyster Bay, NY Filming & Production: Location Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Film location permits in Oyster Bay, NY, sometimes called film shoot permits, production permits, or filming authorizations, cover commercial photography, video shoots, and motion picture production.

Key Facts

Where to apply
Town Clerk, Town Hall
Standard lead time
At least 10 days before filming
Expedited option
3 business days if no complaints in 12 months
Required consent
Written consent of every property owner
Minimum insurance
$1,000,000 liability coverage
Denial appeal
To the Town Board, decision final

Summary

Anyone filming at a specific property in Oyster Bay must apply to the Town Clerk at least ten days ahead, list the exact locations, dates and equipment, and attach written consent from every property owner involved before the Town will issue a location permit.

§ 118-4. Application for permit. A. Applicants for a permit under this chapter must submit the following documents: (1) An application for a permit under this chapter shall be made to the Town Clerk at Town Hall during normal business hours at least 10 days prior to any activity commencing anywhere in the Town of Oyster Bay... (d) Specific locations of the properties to be used. (e) Dates and times of day that the properties will be used. (f) A description of all motor vehicles and bulk equipment to be used in connection with the filming, together with the vehicle registrations and license plate numbers for all such vehicles. (2) Written consent of the owners of all properties where all filming activities are to take place.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4036544; v24 updated 2023-03-07; through 03-07-2023).

Full Breakdown

Section 118-4 sets the application steps for a Chapter 118 filming permit, which Section 118-3 requires before any commercial or student filming or base camp can be set up anywhere in Oyster Bay. The application must be filed with the Town Clerk at Town Hall during normal business hours at least ten days before any activity begins, and must state the name of the person or entity owning the film rights, the location coordinator's contact information, the purpose of the filming, the specific locations of the properties to be used, the dates and times the properties will be used, and a description of all motor vehicles and bulk equipment with their registrations and license plate numbers.

Critically, the application must include the written consent of the owners of every property where filming will take place, not just a general Town permit. 1 lets a production that already held a permit within the last twelve months, with no written resident complaints, reapply on an expedited three-business-day basis instead of the standard ten days. Section 118-6 lets the Town Clerk deny an application that conflicts with other scheduled area events, would be detrimental because of anticipated excessive noise, illumination or other effects, or would unduly interfere with residents' day-to-day activities for an extended period; a denial can be appealed to the Town Board, whose decision is final.

Section 118-9 additionally requires the applicant to carry at least $1,000,000 in liability and property-damage insurance naming the Town as an additional insured, plus a cash bond or letter of credit to guarantee repair of any property damaged during the shoot.

Violations & Fines

Filming without the required permit, or violating a permit condition, is punishable under Section 118-8.1 by a fine of $250 to $1,000 or up to 15 days' imprisonment, with each day of continued violation a separate offense. The Town Clerk can suspend or revoke a permit for violating any law or permit condition, forfeit fees already paid, and bar the applicant from a new permit for one year.

Frequently Asked Questions

How far in advance must I apply for a location filming permit in Oyster Bay?
At least 10 days before the activity begins, under Section 118-4. A production that already held a Town permit within the last 12 months, with no written resident complaints, can use the expedited three-business-day process in Section 118-4.1 instead.
Do I need the property owner's permission to film at a location in Oyster Bay?
Yes. Section 118-4 requires the application to include written consent from the owners of every property where any filming activity will take place, in addition to the Town Clerk's permit.
Can the Town deny a filming location permit application?
Yes. Section 118-6 lets the Town Clerk deny a permit that conflicts with other scheduled events, would be detrimental due to anticipated excessive noise or illumination, or would unduly interfere with residents' daily activities, with any denial appealable to the Town Board.

Sources & Official References

Other rules in Oyster Bay

All Oyster Bay rules

New York rules heatmap·Compare Oyster Bay to another location·View the New York filming & production overview

Get notified when Location Permits in Oyster Bay, NY changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.