Skip to main content
CityRuleLookup

Salem, OR Fire Regulations: Propane Storage (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing section
SRC 58.200 (cross-refs SRC 58.190)
Restricted core area
Market St / UP Railway / Mission St / Willamette River
Permitted zones outside core
EC, IG, and IP zoning only
Grandfather date
facilities operating since Jan. 9, 1956
Approval required
Fire Code Official prior review of location

Summary

Salem restricts where bulk liquefied petroleum gas can be stored above ground, tying the limits in SRC 58.200 to the same geographic boundaries set for flammable and combustible liquid bulk plants in SRC 58.190. Facilities operating continuously since January 9, 1956 are grandfathered if they still meet the chapter's other requirements.

(a)The geographic limits referred to in OFC 6104.2 in which bulk storage of liquefied petroleum gas is restricted shall be the same limits set forth in SRC 58.190.(b)The restrictions as to location set forth in this section shall not apply to bulk storage facilities continually in existence and regular use since January 9, 1956, provided that the bulk storage facilities meet all other requirements of this chapter.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 26 Update 1).

Full Breakdown

SRC 58.200 sets Salem's limits for bulk storage of liquefied petroleum gas by cross-referencing the geographic restriction the City already applies to flammable and combustible liquid bulk plants under SRC 58.190. Those boundaries exclude most of the City's Employment Center (EC), General Industrial (IG), and Industrial Park (IP) zoned land, but even within those zones, bulk LP-gas and other bulk liquid storage is still restricted inside the area bounded by Market Street on the north, the Union Pacific Railway main line right-of-way on the east, Mission Street on the south, and the Willamette River on the west, per SRC 58.190(a). Outside that carved-out core area, EC, IG, and IP-zoned property is where bulk plants are geographically permitted, subject to OFC location and design requirements referenced in SRC 58.190 and 58.200.

The chapter grandfathers existing operations: bulk LP-gas storage facilities that have been continuously in existence and regular use since January 9, 1956 are exempt from the location restriction, as long as they still meet every other requirement of SRC chapter 58 (SRC 58.200(b)). New or relocated bulk storage and bulk plant facilities need the Fire Code Official's prior review and approval of both location and facility type before they can operate (SRC 58.190(b)). Because this sits in the Fire Prevention Code, unauthorized siting or failure to get the Fire Code Official's prior review is enforced the same way as any Fire Prevention Code violation, through stop work orders and civil penalties under SRC 58.011 and the chapter's fee and bond provisions in SRC 58.175 and 58.185.

Violations & Fines

Establishing a bulk LP-gas storage facility outside the permitted EC, IG or IP zones described in SRC 58.190, or without the Fire Code Official's prior review and approval of location and facility type, is a Fire Prevention Code violation subject to a stop work order and the chapter's civil penalty and reinspection provisions under SRC 58.011 and 58.430.

Frequently Asked Questions

Where can bulk LP-gas be stored in Salem?
Outside a restricted core area, and generally only on land zoned Employment Center (EC), General Industrial (IG), or Industrial Park (IP). SRC 58.200 ties LP-gas bulk storage to the same boundaries SRC 58.190 sets for flammable and combustible liquid bulk plants.
Are any existing LP-gas storage facilities in Salem exempt from the location limits?
Yes. SRC 58.200(b) exempts bulk storage facilities that have been continuously in existence and regular use since January 9, 1956, as long as they still meet every other requirement of the Fire Prevention Code.
Do I need City approval before setting up a bulk LP-gas plant in Salem?
Yes. SRC 58.190(b), which SRC 58.200 incorporates for LP-gas, requires the Fire Code Official's prior review and approval of both the location and type of facility before a bulk storage or bulk plant operation can be sited.

Sources & Official References

Other rules in Salem

All Salem rules

Compare Salem to another location·View the Oregon fire regulations overview

Get notified when Propane Storage in Salem, OR changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.