Skip to main content
CityRuleLookup

Lakewood, OH Frost Depth & Snow Load: Deck Footing Depth (2026)

Significant Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Post hole depth
42 inches minimum
Top of footer
36 inches
Inspection point
When post holes are dug, before setting posts
Code edition enforced
2019 Residential Code of Ohio: the current state edition
Packet revision
2025

Summary

Lakewood requires deck post holes to reach a minimum depth of 42 inches, with the top of the footer at 36 inches, and inspects them after digging and before posts are set.

City of Lakewood Department of Housing and Building — Requirements for Deck Submittals. When do I need to call for inspections? When post holes are dug and before setting posts (42" min. depth, 36" top of footer). 2019 Residential Code of Ohio.

Full Breakdown

Decks are the most common reason a homeowner in Ohio needs a footing depth, and Lakewood states its requirement plainly in the deck submittal packet issued by the Department of Housing and Building. Post holes must be a minimum of 42 inches deep, with the top of the footer at 36 inches. The two figures together describe the pour rather than just the hole, the footer occupies the bottom six inches. The inspection point is specific and easy to miss: the city inspects when post holes are dug and before posts are set, so the holes have to be open and ready at that stage rather than filled.

Lakewood's 42-inch depth matches neighbouring Cleveland's general figure, which is what you would expect for two adjacent communities on the Lake Erie shore. The packet works from the 2019 Residential Code of Ohio, the current state edition, and was revised in 2025, making it one of the more current documents of its kind in Ohio.

Violations & Fines

The deck footing inspection happens when post holes are dug and before posts are set. Setting posts before that inspection means the work has to be exposed again. A hole short of 42 inches, or a footer whose top sits above 36 inches, will not pass.

Frequently Asked Questions

How deep do deck footings have to be in Lakewood, Ohio?
Post holes must be a minimum of 42 inches deep, with the top of the footer at 36 inches.
When is the deck footing inspected?
When the post holes are dug and before the posts are set. The holes need to be open at that point, so do not set posts ahead of the inspection.
Is this the same as Cleveland?
The 42-inch depth matches Cleveland's general footing requirement, which is unsurprising for two adjoining Lake Erie communities. Cleveland separately allows 36 inches for one and two family houses.

Sources & Official References

Other rules in Lakewood

All Lakewood rules

Compare Lakewood to another location·View the Ohio frost depth & snow load overview

Get notified when Deck Footing Depth in Lakewood, OH changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.