Key Facts

Rule
Equipment at/above base flood elevation
Covered systems
HVAC, plumbing, electrical service
Wiring exception
Meets state wet-location code
Sewer lines
Automatic backflow valves required
Chapter adopted/amended
8-15-2007; amended 5-22-2013
Enforced by
Town Engineer (local administrator)

Summary

Greenburgh's flood damage prevention law forces electrical, heating, cooling, plumbing and other service equipment in special flood hazard areas above the base flood elevation before storms can reach them, with wiring and outlets exempt only when built to the state's wet-location code.

New and replacement electrical equipment, heating, ventilating, air conditioning, plumbing connections, and other service equipment shall be located at or above the base flood elevation. Electrical wiring and outlets, switches, junction boxes and panels shall be elevated to or above the base flood elevation unless they conform to the appropriate provisions of the electrical part of the Building Code of New York State or the Residential Code of New York State for location of such items in wet locations.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4570580; v39 updated 2025-10-22; through 10-22-2025).

Full Breakdown

Under § 220-5B(3) of Chapter 220, Flood Damage Prevention, new and replacement service equipment, meaning electrical, HVAC and plumbing connections, must sit at or above the base flood elevation in any area of special flood hazard. Wiring, outlets, switches, junction boxes and panels must likewise be elevated unless they meet the wet-location provisions of the Building Code of New York State or Residential Code of New York State. The same subsection requires new and replacement water supply systems to be designed to minimize floodwater infiltration and new sanitary sewage systems to minimize infiltration, with automatic backflow valves mandatory on any discharge line passing through an exterior wall where openings sit below the base flood elevation.

On-site waste disposal systems must be sited to avoid impairment or contamination during flooding. The Town Engineer, as local administrator, reviews these utility protections at the permit stage under § 220-4C(3) and again at construction, requiring a licensed engineer's or architect's certificate that utility floodproofing meets the § 220-5B(3) criteria before a certificate of compliance issues. Deficiencies found during construction-stage inspection trigger a stop-work order under § 220-4D unless corrected immediately, and any work done before the administrator approves the required elevation certification proceeds at the permit holder's risk.

Violations & Fines

Installing service equipment, wiring or sewage connections below the base flood elevation without the required floodproofing certification violates § 220-3D, punishable by a fine of up to $250 or imprisonment up to 15 days, or both, with each day of continued noncompliance a separate offense, in addition to a stop-work order and possible FEMA notification.

Frequently Asked Questions

How high must utilities sit in a Greenburgh flood zone?
Section 220-5B(3) requires new and replacement electrical, heating, cooling and plumbing service equipment to be located at or above the base flood elevation for the applicable FEMA flood zone before the Town will certify the installation.
Can wiring stay below the base flood elevation in Greenburgh?
Only if it conforms to the wet-location provisions of the Building Code of New York State or Residential Code of New York State; otherwise electrical wiring, outlets, switches, junction boxes and panels must be elevated to or above the base flood elevation.
Who checks utility flood protection before occupancy?
The Town Engineer, as local administrator, requires a licensed engineer's or architect's certificate confirming utility floodproofing meets § 220-5B(3) before issuing the certificate of compliance needed to occupy the structure.

Sources & Official References

Other rules in Greenburgh

All Greenburgh rules

New York rules heatmap·Compare Greenburgh to another location·View the New York hurricane preparedness overview

Get notified when Flood Elevation in Greenburgh, NY changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Flood Elevation in Nearby Cities

How other cities in Westchester County handle flood elevation.

New Rochelle, NY
Some Restrictions
Yonkers, NY
Some Restrictions