Key Facts
- Freeboard, Zone VE
- 3 feet above base flood level
- LiMWA coastal zones
- Extra 1 foot, 4 feet total
- Electrical distribution panels
- 6 feet above base flood elevation
- Breakaway wall load rating
- 10 to 20 pounds per square foot
- Structural fill
- Prohibited under elevated structures
Summary
In York County, Virginia, homes and buildings in the coastal V and VE flood zones, the Coastal High Hazard areas most exposed to hurricane storm surge, must be elevated on pilings or columns with the lowest structural member set at least three feet above the base flood level before the Floodplain Administrator will sign off on a permit.
All new construction or substantial improvement in Zone VE of the floodplain management area shall occur in accordance with the applicable floodplain construction provisions for Zone VE contained in the Virginia Uniform Statewide Building Code. ... The VE or V Zones on FIRMs accompanying the FIS shall be those areas that are known as Coastal High Hazard areas, extending from offshore to the inland limit of a primary frontal dune along an open coast. All new construction and substantial improvements in Zones V and VE (V if base flood elevation is available) shall be elevated on pilings or columns so that:a.The bottom of the lowest horizontal structural member of the lowest floor (excluding the pilings or columns) is elevated with a freeboard at least three feet (3') above the base flood level if the lowest horizontal structural member is parallel to the direction of wave approach or elevated at least one foot above the freeboard if the lowest horizontal structural member is perpendicular to the direction of wave approach; and
Full Breakdown
Sec. 24.1-373(e)(14) governs construction in Zone VE, the Coastal High Hazard area extending from offshore to the inland limit of the primary frontal dune, and requires that new construction and substantial improvements comply with the Virginia Uniform Statewide Building Code's Zone VE provisions. All new construction and substantial improvements in Zones V and VE must be elevated on pilings or columns so the bottom of the lowest horizontal structural member sits at least three feet of freeboard above the base flood level (or one foot above the freeboard if that member runs perpendicular to the wave approach), and the pile or column foundation must be anchored against flotation, collapse, and lateral movement from wind and water loads acting together with a 1% annual chance of being equaled or exceeded.
Structures in Coastal VE zones subject to 1.5-3 foot wave heights within the Limits of Moderate Wave Action must add one more foot of freeboard, for four feet total. Electrical equipment and heating/cooling systems must sit at least three feet above base flood elevation, and electrical distribution panels at least six feet above it. Space below the lowest floor must remain free of obstruction or use breakaway walls rated for 10 to 20 pounds per square foot, fill cannot be used for structural support, and dune alteration is prohibited. The Floodplain Administrator must be satisfied that these standards are met before issuing building permits or certificates of occupancy.
Violations & Fines
A structure that lacks the elevation certificate or engineer's certification required under Sec. 24.1-373 is presumed to be in violation until documentation is provided. Enforcement runs through Sec. 24.1-109 and Article VI of Chapter 7.1, Building Regulations, and the Floodplain Administrator may issue notices of violation, stop-work orders, and require corrective action before a certificate of occupancy issues.
Frequently Asked Questions
How high must a house be elevated in York County's coastal VE zone?
Is there extra freeboard near the coast for wave action?
Can I put fill under an elevated coastal home for support?
Can I alter a sand dune to build in the VE zone?
Sources & Official References
Other rules in York County
Compare York County to another location·View the Virginia hurricane preparedness overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.