Paterson, NJ Landscaping Rules: Rainwater Harvesting (2026)
Key Facts
- Recognized as
- Approved green infrastructure BMP
- Runoff quantity credit
- Yes
- Groundwater recharge credit
- No
- TSS pollutant removal
- 0%
Summary
Paterson's stormwater code lists cisterns as an approved green infrastructure practice for major development, crediting them for runoff-quantity control but not for groundwater recharge or pollutant removal.
Table 1 Green Infrastructure BMPs for Groundwater Recharge, Stormwater Runoff Quality, and/or Stormwater Runoff Quantity
Best Management Practice Stormwater Runoff Quality TSS Removal Rate Stormwater Runoff Quantity Groundwater Recharge Minimum Separation From Seasonal High Water Table (Feet) Cistern 0% Yes No — Dry well(a) 0% No Yes 2 Grass swale 50% or less No No 2(e) 1(f) Green roof 0% Yes No — Manufactured treatment device(a)(g) 50% or 80% No No Dependent upon the device Pervious paving system(a) 80% Yes Yes(b) No(c) 2(b) 1(c) Small-scale bioretention basin(a) 80% or 90% Yes Yes(b) No(c) 2(b) 1(c) Small-scale infiltration basin(a) 80% Yes Yes 2 Small-scale sand filter 80% Yes Yes 2 Vegetative filter strip 60% to 80% No No —
Notes corresponding to annotations (a) through (g) are found following Table 3. Table 2 Green Infrastructure BMPs for Stormwater Runoff Quantity (or for Groundwater Recharge and/or Stormwater Runoff Quality with a Waiver or Variance from N.J.A.C. 7:8-5.3)
Best Management Practice Stormwater Runoff Quality TSS Removal Rate Stormwater Runoff Quantity Groundwater Recharge Minimum Separation From Seasonal High Water Table (Feet) Bioretention system 80% or 90% Yes Yes(b) No(c) 2(b) 1(c) Infiltration basin 80% Yes Yes 2 Sand filter(b) 80% Yes Yes 2 Standard constructed wetland 90% Yes No N/A Wet pond(d) 50% to 90% Yes No N/A
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4713536; v19 updated 2025-12-16; through 12-16-2025).
Full Breakdown
Chapter 433's Table 1 of green infrastructure best management practices, the list engineers must use to meet Paterson's stormwater standards for 'major development', names 'Cistern' as an approved measure. The table credits cisterns with reducing stormwater runoff quantity but assigns them 0% TSS pollutant removal and no groundwater recharge credit, so they can't stand in for other required controls on a covered site. This is a stormwater-compliance provision, not a residential rain-barrel program: it governs major development, not routine backyard rainwater collection.
Violations & Fines
There's no separate rainwater-harvesting violation; a major-development project that substitutes a cistern where the code requires a different BMP, or fails §§ 433-3/433-4 design standards, risks the § 433-12 fine of up to $1,250.
Frequently Asked Questions
Can I install a rain barrel at my Paterson home?
Does a cistern satisfy groundwater recharge requirements?
Sources & Official References
Other rules in Paterson
Compare Paterson to another location·View the New Jersey landscaping rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.