Skip to main content
CityRuleLookup

Santee, CA Landscaping Rules: Rainwater Harvesting (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing chapter
Santee Municipal Code Chapter 13.36, Landscape and Irrigation Regulations
Adopted
Ordinance 566 § 3, 2019
Design target
Capture from 1-inch or 85th-percentile 24-hour storm
Enforcing agency
City of Santee Development Services
Trigger
New construction and rehabilitated landscapes of 2,500+ sq ft
First-offense fine
$100 per day, rising to $1,000 for repeat violations

Summary

In the City of Santee, Municipal Code § 13.36.070 requires every landscape and grading design plan reviewed by Development Services to integrate stormwater best management practices that increase on-site rainwater retention and infiltration. New landscapes must comply with the City's municipal stormwater permit from the San Diego Regional Water Quality Control Board, and site design should capture runoff from the one-inch, 24-hour storm.

§ 13.36.070. Stormwater management and rainwater retention. A. Stormwater management practices, as described in Chapter 9.06, minimize runoff and increase infiltration which recharges groundwater and improves water quality. Stormwater best management practices shall be integrated into the landscape and grading design plans to minimize runoff and to increase on-site rainwater retention and infiltration. ... ... D. It is strongly recommended that landscape areas be designed for capture and infiltration capacity that is sufficient to prevent runoff from impervious surfaces (i.e., roof and paved areas) from either: (1) the one inch, 24-hour rain event; or (2) the 85th percentile, 24-hour rain event, and/or additional capacity as required by any applicable local, regional, State or Federal regulation. ... ... 6. Incorporate rain gardens, cisterns, and other rain harvesting or catchment systems.

Full Breakdown

Santee Municipal Code Chapter 13.36, the Landscape and Irrigation Regulations adopted by Ordinance 566 in 2019, folds rainwater capture into every landscape documentation package Development Services reviews for new construction and rehabilitated landscapes of 2,500 square feet or more. Section 13.36.070(A) ties this directly to the citywide stormwater program in Chapter 9.06, requiring landscape and grading plans to minimize runoff and increase on-site rainwater retention and infiltration rather than treating it as an afterthought. Section 13.36.070(B) makes every landscape and irrigation system subject to the City's active municipal stormwater permit issued by the San Diego Regional Water Quality Control Board, and subsection (C) requires friable soil throughout planted areas to maximize retention and infiltration.

Subsection (D) sets a strongly recommended capture and infiltration target: enough capacity to prevent runoff from roofs and paved areas from either the one-inch, 24-hour rain event or the 85th percentile, 24-hour rain event, whichever regional or State rule applies. Subsection (E) lists the specific techniques the City expects applicants to use to hit that target, including rain gardens, cisterns, and other rain harvesting or catchment systems, grading driveways to drain toward vegetated areas, pervious pavers and porous concrete, infiltration beds, swales, basins and drywells, and directing roof and paved-surface runoff into planting beds.

Subsection (F) requires stormwater best management practices during both installation and testing of the landscape and irrigation work. These retention requirements sit alongside the chapter's water-budget rules: new residential landscapes are capped by an evapotranspiration adjustment factor of 0.55 and nonresidential landscapes at 0.45 under Section 13.36.010(A)(13)(d), so on-site capture and reuse directly reduce the metered irrigation a project is allowed. Development Services checks compliance through the landscape documentation package and certificate of completion process required under Sections 13.36.040 and 13.36.050 before final inspection can close out the permit.

Violations & Fines

Section 13.36.090 lets the City assess penalties for noncompliance with Chapter 13.36 as stated in Title 1 of the Municipal Code. Under Section 1.08.020, Development Services enforcement officers may issue administrative citations with daily fines of $100 for a first violation, $200 for a second, $500 for a third, and $1,000 for a fourth or later violation within 12 months, up to $5,000 per violation and a $250,000 citywide cap absent a Council resolution, plus recovery of the City's investigation and attorney costs.

Frequently Asked Questions

Does Santee require rainwater harvesting systems like cisterns?
The City strongly recommends but does not mandate cisterns and rain gardens. Municipal Code § 13.36.070(E) lists rain harvesting and catchment systems, pervious pavers, and infiltration beds as techniques applicants should use to meet the recommended capture target for the one-inch or 85th-percentile 24-hour storm, but the mandatory pieces of the section are the stormwater permit compliance and friable-soil requirements.
What stormwater permit applies to landscaping in Santee?
All landscape and irrigation work must comply with the City of Santee's current municipal stormwater permit issued by the San Diego Regional Water Quality Control Board under Municipal Code § 13.36.070(B). Development Services checks this as part of the landscape documentation package review required before a building permit or grading plan is approved for qualifying projects.
Who enforces the rainwater retention rules and what are the fines?
Development Services enforces Chapter 13.36 through the administrative citation process in Section 1.08.020. Fines run $100 for a first violation per day, $200 for a second, $500 for a third, and $1,000 for a fourth or later violation within twelve months, with a possible $5,000-per-violation ceiling and $250,000 citywide cap.

Sources & Official References

Other rules in Santee

All Santee rules

California rules heatmap·Compare Santee to another location·View the California landscaping rules overview

Get notified when Rainwater Harvesting in Santee, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Rainwater Harvesting in Nearby Cities

How other cities in San Diego County handle rainwater harvesting.

Encinitas, CA
Light Restrictions
San Marcos, CA
Some Restrictions
San Diego, CA
Some Restrictions
Vista, CA
Some Restrictions
El Cajon, CA
Some Restrictions
Escondido, CA
Some Restrictions
Carlsbad, CA
Few Restrictions
Oceanside, CA
Few Restrictions