Tree removal permit rules in Collier County, FL, sometimes called heritage tree, protected tree, or street tree ordinances, list which trees require a permit before you can cut them down.

Key Facts

Permit required from
County Manager or designee, for any vegetation removal or fill
Permit validity
No more than 180 days; extension requested before expiry
Single-family lot exemption
Clearing 1 acre or less, once a building permit has issued
Specimen trees
Never covered by the 1 acre exemption; designated by Board resolution
Tree protection barrier distance
6 feet from the trunk or beyond the drip line, whichever is greater
Survey swath exemption
Licensed surveyors, individual trees within a swath under 3 feet wide
Review fee
Set by resolution of the Board of County Commissioners

Summary

In unincorporated Collier County, no one can remove or otherwise destroy vegetation, including by placing additional fill, without first getting a vegetation removal or vegetation removal and fill permit from the County Manager or designee. LDC Sec. 3.05.01(B) binds individuals, companies and every level of government. An approved permit lasts up to 180 days, and a list of exemptions applies.

These county ordinances apply to unincorporated areas of Collier County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

The purpose of this section is the protection of vegetation within the County by regulating its removal; to assist in the control of flooding, soil erosion, dust, heat, air pollution, and noise; and to maintain property, aesthetic, and health values within the County; [...] It is not the intent of this section to restrict the mowing of nonprotected vegetation in order to meet the requirements of other sections of this LDC. B. It shall be unlawful for any individual, firm, association, joint venture, partnership, estate, trust, syndicate, fiduciary, corporation, group, or unit of federal, state, County, or municipal government to remove, or otherwise destroy, vegetation, which includes placing of additional fill, without first obtaining a vegetation removal or vegetation removal and fill permit from the County Manager or designee, except as hereinafter exempted.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 126 | Land Development Code: Supplement 33).

Full Breakdown

The rule sits in Land Development Code Sec. 3.05.01, which opens with its purpose: protect vegetation by regulating its removal, help control flooding, soil erosion, dust, heat, air pollution and noise, and maintain property, aesthetic and health values. Subsection B is the operative ban. It reaches any individual, firm, partnership, corporation, or unit of federal, state, County, or municipal government, so a public agency is held to the same permit requirement as a homeowner unless an exemption applies. Placing additional fill counts along with removal, which is why the permit comes in a combined vegetation removal and fill version. Mowing nonprotected vegetation to satisfy other LDC sections is expressly outside the section.

The County Manager or designee decides each application under Sec. 3.05.03. An approved permit is valid for no more than 180 days. An extension must be requested before the original permit expires and needs good cause shown in a written application. The review fee is set by resolution of the Board of County Commissioners. Conditions on a permit can only concern how vegetation that stays is designated and protected.

Sec. 3.05.05 lists when a permit can be issued. The grounds include vegetation that is a safety hazard to pedestrian or vehicular traffic, utilities or an existing structure; diseased or unhealthy vegetation judged by standard horticultural practices; removal allowed by a final local development order; mechanical removal of prohibited exotics; a single-family lot where the principal structure cannot be built or access is impeded; and protected vegetation posing an imminent threat to human safety or an adjacent building.

Sec. 3.05.02 carves out exemptions. On single-family lots with no bald eagle nest, no permit is needed to clear 1 acre or less of protected vegetation once a building permit has issued, or once the house is built and the total cleared area stays within one acre, provided other agency permits are in hand. That exemption never covers a specimen tree, and it does not apply to undeveloped coastal barrier islands or the ST, ACSC-ST and RFMU overlay districts. Licensed tree farms, state-governed mangrove trimming and hand removal of prohibited exotics are also exempt.

Violations & Fines

Removing or destroying vegetation, or placing additional fill, without the permit breaks Sec. 3.05.01(B). Violating a condition attached to a permit is cause to void it under Sec. 3.05.03(B)(1). Vegetation destroyed or receiving major damage during construction must be replaced with vegetation of equal environmental value, as specified by the County Manager or designee, before occupancy or use, unless a permit approved the removal (Sec. 3.05.04 A). The County Manager or designee can also inspect the site to test a proposed removal against the Sec. 3.05.05 criteria.

Frequently Asked Questions

Do I need a permit to cut down a tree on my single-family lot in Collier County?
Yes, unless an exemption applies. Sec. 3.05.01(B) bars removing or destroying vegetation without a permit from the County Manager or designee. On a lot subdivided for single-family use, no permit is needed to clear 1 acre or less of protected vegetation once a building permit has issued, but a specimen tree is never covered by that exemption.
How long does a Collier County vegetation removal permit last?
An approved permit is valid for a period not to exceed 180 days. If you need more time, you must request an extension before the original permit expires, and it can be granted for good cause shown on a written application to the County Manager or designee. The review fee is set by Board of County Commissioners resolution.
Can I remove a dead, diseased or dangerous tree?
A permit can be issued for it. Sec. 3.05.05 allows removal of protected vegetation that is a safety hazard to pedestrians, vehicles, utilities or an existing structure, and of diseased or unhealthy vegetation as judged by standard horticultural practices, with a site inspection by the County Manager or designee if required. Imminent threats to human safety or an adjacent building also qualify.
What protection do trees that stay need during construction?
Sec. 3.05.04 requires a continuous, highly visible barrier of wood stakes set at most 10 feet apart, 2 to 4 feet high, covered with brightly colored all-weather mesh. A single retained tree gets a barrier at 6 feet from the trunk or beyond the drip line, whichever is greater. No soil removal, fill or debris is allowed inside the dripline.
What counts as a specimen tree?
Sec. 3.05.09 says the Board of County Commissioners can designate a plant a specimen tree by resolution because of its historical significance, rarity in the County, age, or extraordinary size. Specimen trees are carved out of the single-family 1 acre exemption, the site plan exemption and the surveyor exemption in Sec. 3.05.02.

Sources & Official References

Other rules in Collier County

All Collier County rules

Florida rules heatmap·Compare Collier County to another location·View the Florida landscaping rules overview

Get notified when Tree Removal & Heritage Trees in Collier County, FL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.