Franklin, TN Noise from Specific Sources: Generator Noise (2026)
Key Facts
- Regulated as
- 'Construction activity' under Sec. 12-1301(2)(d)
- Permitted window
- 7 a.m.-6 p.m. weekdays, 9 a.m.-6 p.m. Sat
- Barred days
- Sundays and city holidays
- Distance exemption
- 1,000+ ft from occupied residence
- Liable parties
- Owner, developer, contractor, equipment supplier
Summary
Franklin treats continual use of a portable generator as regulated 'construction activity' under Sec. 12-1301(2)(d), so generator noise on a permitted job site is confined to the same construction-hours window: weekdays 7 a.m. to 6 p.m. and Saturdays 9 a.m. to 6 p.m., with no use on Sundays or city holidays once permanent utility power is available.
(2)Definition of construction activity. For purposes of determining the application of this section, construction activity includes, but is not limited to, the following:(a)Grading and excavating.(b)Pouring and placing concrete or the presence of concrete mixing trucks or pumping vehicles/equipment.(c)Operating construction-related equipment and tools, including but not limited to, pile drivers, power shovels, pneumatic hammers, power hoists, compressors, and other construction-type devices.(d)Continual use of portable generators where the electric utility will connect temporary power service.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 30 Update 1).
Full Breakdown
Franklin's construction-hours ordinance defines 'construction activity' to include, among other listed acts, continual use of portable generators where the electric utility will connect temporary power service (Sec. 12-1301(2)(d)). , and no construction activity requiring a permit may occur on Sundays and city holidays. The generator restriction applies specifically to continual use while a site awaits permanent electric utility connection, distinguishing routine job-site generators from emergency generators run by utilities restoring service, which fall under the separate 'emergency activities' exemption in Sec. 12-1301(3)(h). A generator running on a greenfield or unoccupied-building site more than 1,000 feet from an occupied residence is exempt from the hours restriction altogether under Sec.
12-1301(3)(a), and generator noise from work fully inside an occupied structure that isn't audible from the adjacent street is exempt under Sec. 12-1301(3)(b). As with all construction activity, the owner, developer, and general contractor can each be cited if a generator runs outside the permitted hours, and citations can reach the equipment-rental company that supplied it. A contractor who racks up two or more stop-work orders in 12 months for hours violations, including generator noise, is barred from new permits on related projects for at least a month and must complete additional erosion-control training before resuming a normal inspection schedule.
Violations & Fines
Running a generator outside the permitted construction window is punishable by the fine set in Appendix A, Comprehensive Fees and Penalties, with citations issued to Franklin Municipal Court. The building official can issue a stop-work order of at least five business days for repeat offenders, and citations can reach the owner, contractor, and the company that rented or supplied the generator.
Frequently Asked Questions
Are job-site generators covered by Franklin's construction noise rule?
Can a generator run overnight on a Franklin job site?
Does the generator rule apply to a house far from any neighbor?
Sources & Official References
Other rules in Franklin
Compare Franklin to another location·View the Tennessee noise from specific sources overview
See something wrong?