Skip to main content
CityRuleLookup

Minneapolis, MN Noise Ordinances: Construction Hours (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Construction hours in Minneapolis, MN, sometimes called construction noise rules or contractor work-hour ordinances, set when contractors can run power tools, hammers, and heavy equipment.

Key Facts

Default hours
Weekdays 7 a.m. to 6 p.m.
After-hours work
Requires Health Department permit
Notice required
At least 36 hours ahead
Owner-occupant exemption
Weekdays to 8 p.m.; weekends 9–6
Noise-limit status
Exempt from citywide decibel caps

Summary

Minneapolis limits construction equipment to weekdays 7 a.m.–6 p.m.; work outside those hours needs an after-hours permit from the Health Department, arranged at least 36 hours in advance.

(a) Operation of construction equipment without a permit is allowed only on Monday through Friday from 7:00 a.m. to 6:00 p.m., not including federal holidays. Operation of construction equipment outside of these hours and days without a permit from the Minneapolis Health Department and/or their designee is prohibited.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 72).

Full Breakdown

City Code § 59.30 requires an after-hours work permit from the Minneapolis Health Department to operate construction equipment outside 7:00 a.m. to 6:00 p.m., Monday through Friday, excluding federal holidays. Owner-occupants doing work on their own residential property get a wider window, weekdays 7 a.m. to 8 p.m., weekends and holidays 9 a.m. to 6 p.m., without a permit. Permits must be requested at least 36 hours ahead, with 24-hour notice to neighbors and the building owner. Separately, § 389.60(c)(4) of the noise chapter exempts pile drivers, jackhammers, cranes, backhoes, bulldozers and other construction equipment from the citywide decibel limits, so daytime construction noise is regulated by hours, not sound level.

Violations & Fines

Operating construction equipment without a permit outside permitted hours is an ordinance violation under § 59.90, enforceable as a criminal or administrative offense with penalties under §§ 1.30 and Chapter 2; each day of noncompliance is a separate violation.

Frequently Asked Questions

Can I run a jackhammer at night in Minneapolis?
Not without a permit. Construction equipment is limited to 7 a.m.–6 p.m. weekdays; operating outside that window requires an after-hours work permit from the Minneapolis Health Department, arranged at least 36 hours in advance.
Does the noise ordinance cap how loud construction equipment can be?
No. Section 389.60(c)(4) exempts pile drivers, jackhammers, cranes, bulldozers and similar construction equipment from the citywide decibel limits: construction noise is controlled by hours, not sound level.

Sources & Official References

Other rules in Minneapolis

All Minneapolis rules

How Minneapolis compares: Cities with the Strictest Construction Hours·Compare Minneapolis to another location·View the Minnesota noise ordinances overview

Get notified when Construction Hours in Minneapolis, MN changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.