Tazewell County, IL Noise Ordinances: Decibel Limits (2026)
Key Facts
- Noise limit
- 60 decibels at property line
- Exception
- Short-term events, outages/severe storms
- Minimum parcel size
- 1 acre, accessory use only
- Excluded zones
- R-1 and R-2 Zoning Districts
- Reviewing office
- Community Development Administrator
Summary
Tazewell County limits a small wind energy system to 60 decibels measured at the closest property line, with an exception during short-term events like utility outages or severe wind storms. The Community Development Administrator reviews compliance as part of the building permit for the turbine.
Noise. The small wind energy system shall not exceed a noise level of 60 decibels as measured at the closest property line. The noise level may be exceeded during short-term events such as utility outages and/or severe wind storms.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2026 S-7: Supplement contains: Local legislation current through Ord. LU-21-12, passed 9-29-2021; and Res. LU-26-09, passed 7-29-2026).
Full Breakdown
' This sits within the small wind energy systems subchapter, which requires a site plan submitted to the Community Development Administrator demonstrating compliance with setbacks (110% of system height from adjacent property lines, 150% from any inhabited structure or right-of-way), Uniform Statewide Building Code and National Electric Code compliance, and FAA notification where applicable. Sec. 23 confines small wind energy systems to parcels of at least one acre used as an accessory to a primary structure, bars them from vacant parcels, allows them in all zoning districts except R-1 and R-2, and caps a parcel at one system.
This 60-decibel property-line standard is the only fixed numeric decibel ceiling written directly into Tazewell County's code; the county's larger commercial wind energy facilities instead defer to Illinois Pollution Control Board noise rules (Sec. 06(G)) rather than stating their own number, and the county's mass-gathering amplifier limit under Sec. 04(C)(9) is a separate 70-decibel standard that only applies to large permitted events, not to fixed installations like turbines.
Violations & Fines
Chapter 153 ties noncompliant small wind energy systems to the building permit and special-use process rather than to a chapter-wide dollar penalty; a system that exceeds 60 decibels outside the short-term exception fails the Sec. 153.24(D) building-permit compliance showing required before installation, subjecting the owner to the county's zoning and building code enforcement remedies for an unpermitted or noncompliant structure.
Frequently Asked Questions
Can my home wind turbine exceed 60 decibels during a storm?
Where is the 60-decibel limit measured?
Can I install a small wind turbine in an R-1 residential district?
Sources & Official References
Other rules in Tazewell County
Compare Tazewell County to another location·View the Illinois noise ordinances overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.