Key Facts

Where allowed
Accessory use in all zoning districts
Single-family requirement
1 EV-ready space per dwelling unit
Multifamily requirement
40% capable, 40% ready, 10% installed
Nonresidential requirement
40% capable, 10% installed
Trigger
New development or 50%+ parking expansion

Summary

Chapter 17.115 ECDC allows Level I, II and III electric vehicle charging stations as an accessory use in every Edmonds zoning district, and requires new development, substantially damaged buildings, or parking lots expanded by 50 percent or more to install a set percentage of EV-capable, EV-ready or EV-installed parking spaces.

A. Level I, Level II, and Level III Electric Vehicle Charging Stations. An electric vehicle charging station equipped with Level I, Level II, or Level III charging equipment is allowed as an accessory use in all zoning districts. B. Battery Exchange Stations. Battery exchange stations are considered a primary or accessory use as part of an automobile service station as defined in ECDC 21.90.012 and an accessory use to an automotive sales use. Battery exchange stations are allowed in all zoning districts where automotive sales and automobile service stations are permitted and according to the regulations for those uses set forth in the specific zoning district. ... ... A. Applicability. Development for each of the land uses identified in Table 17.115.040 shall be required to provide electric vehicle charging infrastructure when one of the following occurs: 1. A new development or new off-street parking facility; 2. Substantial damage or substantial improvements to an existing development is made within a one-year period as determined by the building official.

View official code

Official source re-checked September 8, 2026: no newer edition of the code had been published (publisher’s edition: current through Ordinance 4444, passed August 3, 2026).

Full Breakdown

030 permits any electric vehicle charging station, whether Level I (120-volt slow charging), Level II (208 or 240-volt medium charging) or Level III (480-volt or higher rapid charging), as an accessory use in all zoning districts citywide. Battery exchange stations are treated as a primary or accessory use only as part of an automobile service station or automotive sales use, and are allowed wherever those uses are permitted under the applicable zoning district's own rules. 040 whenever a project involves new development, a new off-street parking facility, substantial damage or improvement within a one-year period, or a parking capacity increase of 50 percent or more: single-family dwellings need one EV-ready space per unit, multifamily development needs 40 percent EV-capable, 40 percent EV-ready and 10 percent EV-installed spaces, and nonresidential uses need 40 percent EV-capable and 10 percent EV-installed spaces.

A developer may substitute a higher tier of infrastructure for a lower one, such as converting EV-capable spaces to EV-ready, as long as the combined minimum stays the same. The planning and development director may reduce the required infrastructure type, but never the overall count of required EV parking spaces, if the added electrical load would significantly strain local utility infrastructure.

Violations & Fines

Chapter 17.115 sets no separate fine of its own; providing the required EV-capable, EV-ready or EV-installed spaces is a standard condition of site plan and building permit approval enforced by the planning and development director, and a project that fails to meet Table 17.115.040's minimums will not clear permit review or final inspection.

Frequently Asked Questions

Can I install a home EV charger in any Edmonds zoning district?
Yes. ECDC 17.115.030 allows Level I, II or III electric vehicle charging stations as an accessory use in every zoning district in the city, with no district-by-district restriction.
Does a new Edmonds apartment building have to include EV charging?
Yes. Under Table 17.115.040, new multifamily development must provide EV-capable wiring for 40 percent of parking spaces, EV-ready circuits for another 40 percent, and fully installed EV chargers for 10 percent.
Do single-family homes in Edmonds need EV charging infrastructure?
New single-family construction must provide one EV-ready parking space per dwelling unit under Table 17.115.040, though multiple units with individual garages follow the single-family standard rather than the multifamily one.

Sources & Official References

Other rules in Edmonds

All Edmonds rules

Compare Edmonds to another location·View the Washington parking rules overview

Get notified when EV Charging in Edmonds, WA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

EV Charging in Nearby Cities

How other cities in Snohomish County handle ev charging.

Lynnwood, WA
Light Restrictions
Marysville, WA
Some Restrictions
Everett, WA
Few Restrictions