Skip to main content
CityRuleLookup

Santa Cruz County, CA Parking Rules: Loading Zones (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Trigger size
Retail over 10,000 sq ft, warehouse, industrial, mortuaries
Loading ratio
1 berth per 5,000 sq ft of floor area
Standard berth size
45 ft long, 12 ft wide, 14 ft clearance
Mortuary hearse berth
24 ft long, 10 ft wide, 8 ft clearance
Surface spec
2 in. asphalt over 5 in. Class II base rock
Yard restriction
Not allowed in required front, side, or rear yard
Enforcing agency
Planning Department under SCCC § 19.01.030

Summary

Unincorporated Santa Cruz County requires off-street loading berths for retail uses over 10,000 square feet, wholesale and warehousing establishments, industrial uses, and mortuaries under SCCC § 13.16.080. One berth is required per 5,000 square feet of floor area, each at least 45 feet long, 12 feet wide, with 14 feet of overhead clearance, paved, and kept out of required front, side, or rear yards.

These county ordinances apply to unincorporated areas of Santa Cruz County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

(A) All retail business uses larger than 10,000 square feet, wholesale or warehousing establishments and industrial uses shall provide one loading space for each 5,000 square feet of floor area. Each mortuary shall provide one loading space for hearses regardless of the amount of floor area devoted to said use, and one additional loading space for each 5,000 square feet over the initial 5,000 square feet devoted to said use. (B) Off-street loading facilities shall conform to the following standards: (1) Each loading berth shall be not less than 45 feet long and 12 feet wide and shall have an overhead clearance of not less than 14 feet, except that for mortuaries, a loading berth used exclusively for hearses shall be not less than 24 feet long and 10 feet wide, and shall have an overhead clearance of not less than eight feet. ... (8) A loading area shall not be located in a required front, side or rear yard.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 5004302; v11 updated 2026-05-19; through 05-19-2026).

Full Breakdown

578, repealed by the same ordinance) and now governs loading facilities countywide outside the incorporated cities of Santa Cruz, Watsonville, Capitola, and Scotts Valley. The ratio is one loading space for every 5,000 square feet of floor area for qualifying retail, wholesale, warehousing, and industrial uses. Mortuaries face a separate rule: one berth sized for hearses is required regardless of floor area, plus an additional berth for each 5,000 square feet beyond the first 5,000. Standard berths must be at least 45 feet long and 12 feet wide with 14 feet of overhead clearance; hearse-only berths at mortuaries may be smaller, 24 feet long, 10 feet wide, and 8 feet of clearance.

Every berth must be reachable directly from a street or alley, provide room to turn and maneuver, and sit on pavement built to at least two inches of asphalt concrete over five inches of Class II base rock so the surface stays dustless and drains properly. Loading areas cannot sit in a required front, side, or rear yard, and any lighting must be shielded from glare onto neighboring residential parcels. No vehicle repair or servicing is permitted in a loading area, and the area must stay free of trash, debris, and advertising displays.

A property owner cannot change the number of loading spaces shown on an approved parking plan without formally amending the development permit through the Planning Department. Businesses can also satisfy the requirement by permanently allocating loading berths on an adjoining site, but only through a recorded easement that specifies hours of operation and cannot be terminated without a permit amendment eliminating or replacing the loading requirement.

Violations & Fines

Loading facility violations are land use code violations enforced by the Planning Department under SCCC § 19.01.030, which authorizes abatement as a public nuisance, administrative citation under Chapter 1.13 SCCC, permit revocation, stop-work orders, or civil injunction. Because no penalty is specified in Chapter 13.16, a conviction defaults to the misdemeanor penalty in SCCC § 1.12.030: up to six months in County jail, a fine up to $1,000, or both, with each day of noncompliance a separate offense.

Frequently Asked Questions

Which businesses in unincorporated Santa Cruz County must provide loading berths?
Any retail business larger than 10,000 square feet, plus wholesale, warehousing, industrial uses, and mortuaries, per SCCC § 13.16.080(A). The requirement is one loading berth for every 5,000 square feet of floor area devoted to the use, and mortuaries must provide at least one hearse berth no matter how small the floor area is.
How big does a loading berth have to be?
SCCC § 13.16.080(B)(1) requires standard berths at least 45 feet long, 12 feet wide, with 14 feet of overhead clearance. A hearse-only berth at a mortuary may be smaller: 24 feet long, 10 feet wide, with only 8 feet of clearance.
Can a loading berth go in the front yard?
No. SCCC § 13.16.080(B)(8) bars locating a loading area in any required front, side, or rear yard, and the paved surface must drain properly and stay free of glare-producing lighting toward neighboring homes.
What happens if a business removes a required loading space?
It cannot, without amending its permit. SCCC § 13.16.080(C) prohibits changing the number of loading spaces shown on an approved parking plan unless the permit is formally amended, and unpermitted changes are enforced as land use violations under SCCC § 19.01.030.

Sources & Official References

Other rules in Santa Cruz County

All Santa Cruz County rules

California rules heatmap·Compare Santa Cruz County to another location·View the California parking rules overview

Get notified when Loading Zones in Santa Cruz County, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Loading Zones in Cities Across Santa Cruz County