Decatur, AL Parking Rules: Loading Zones (2026)
Key Facts
- Applies to
- Business and industrial districts only
- Trigger
- Structures erected or altered after June 3, 1958
- Where specified
- District schedule in §§ 25-10 through 25-12
- B-1 row
- Use required rear or side yard
- B-2 row
- Space required when lot does not adjoin an alley
- General penalty
- $1 to $500 per offense under § 1-8
Summary
In the City of Decatur, Alabama, every structure built or altered after June 3, 1958 in a business or industrial district must provide off-street loading and unloading facilities as set out in the district schedule in City Code §§ 25-10 through 25-12. The rule is a design requirement tied to the zoning district, not a posted-hours curb zone.
In each business and industrial district each structure erected or altered after June 3, 1958, shall be provided with off-street loading and unloading facilities as specified in the district schedule set out in sections 25-10 through 25-12.
Full Breakdown
Section 25-17 of the Code of Decatur, Alabama is short: in each business and industrial district each structure erected or altered after June 3, 1958, must be provided with off-street loading and unloading facilities as specified in the district schedule set out in sections 25-10 through 25-12. The section does not list hours or dimensions itself. The numbers and placement rules live in the schedule rows for each district.
The business district schedule in § 25-11 prints a loading row for each district. In B-1 Local Shopping District, the row reads that the use shall use the required rear or side yard for loading and unloading. In B-2 General Business, the row requires space for loading and unloading for structures hereafter erected or altered when the structure is not on a lot adjoining a public or private alley. Because the requirement attaches to erected or altered structures, an existing building that is expanded or converted picks up the obligation at that point.
Loading space competes with parking space for the same lot, and § 25-16 protects both. Whenever two or more uses are made of the same property, the parking requirements for each apply, and § 25-14 keeps required open space and yards from being counted twice for different buildings. Site plans in the Decatur redevelopment district also treat loading areas as something to screen: the buffer berm along 7th Avenue SE is meant to leave no parking lot, dumpster or loading area visible from adjoining properties. Residential districts are outside § 25-17, which speaks only to business and industrial districts.
Violations & Fines
Section 25-17 states the duty but carries no penalty of its own. A structure built or altered without the schedule's loading facilities is a code violation, and the § 1-8 general penalty applies: a misdemeanor punishable by a fine of $1.00 to $500.00, up to six months of imprisonment or hard labor, and each day counted as a separate offense. The building director administers the zoning chapter and issues the permits.
Frequently Asked Questions
Does Decatur set loading zone hours?
Where does a B-1 store in Decatur load trucks?
What does B-2 General Business require for loading?
Does a residential lot need a loading area in Decatur?
Sources & Official References
Other rules in Decatur
Compare Decatur to another location·View the Alabama parking rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.