Lewis County, WA Parking Rules: Loading Zones (2026)
Key Facts
- Trigger
- 20+ required parking spaces
- Minimum loading bay size
- 14 ft wide, 60 ft long, 15 ft high
- Added space threshold, retail
- Every additional 10,000 sq ft
- Added space threshold, industrial
- Every additional 30,000 sq ft
- Small-lot exemption
- Under 0.5 acre, no ROW spillover
Summary
Commercial, industrial and mixed-use projects in Lewis County's Small Town UGAs that need 20 or more parking spaces must also provide an off-street loading area at least 14 feet wide, 60 feet long and 15 feet high, with extra spaces required as building size grows.
(1) Commercial, industrial and mixed-use development that requires 20 or more parking spaces shall provide an off-street loading area for the delivery or loading of goods. (2) A loading space shall have minimum dimensions of not less than 14 feet in width, 60 feet in length, exclusive of driveways, aisles, and other circulation areas, and a height or clearance of not less than 15 feet.
Full Breakdown
225 sets the loading zone standard for the Packwood and Onalaska Small Town Urban Growth Areas. Any commercial, industrial or mixed-use development that requires 20 or more parking spaces under the chapter's parking table must provide an off-street loading area for delivering or loading goods. Each loading space must measure at least 14 feet wide by 60 feet long, excluding driveways, aisles and other circulation areas, with a clearance of at least 15 feet, big enough for a standard delivery truck. Standalone commercial or residential development that does not rely on semi-trucks or similarly sized delivery vehicles can instead use ordinary parking stalls to load and unload.
The number of required spaces scales with size: one loading space per 10,000 square feet of nonresidential use, plus one more space for every additional 10,000 square feet for retail and restaurant buildings, or one more for every additional 30,000 square feet for manufacturing, warehouse and service uses. Mixed-use projects with staggered delivery schedules can share a single loading area if they show deliveries happen at different times to the extent practicable. Lots under half an acre are excused from providing a loading zone if they can demonstrate deliveries will not spill into the public right-of-way, though that exemption disappears for a shared parking lot whose combined development exceeds half an acre.
Lewis County Community Development reviews loading zone compliance at site plan and building permit review; the section was adopted by Ord. 1367 (Exh. C) in 2025.
Violations & Fines
Operating a covered commercial, industrial or mixed-use development without the required off-street loading area is a civil infraction under LCC § 17.07.010, enforced through Chapter 1.20 LCC's code enforcement process with each day of noncompliance treated as a separate offense, and repeat or unresolved violations can be prosecuted as a misdemeanor or sued as a public nuisance under LCC § 17.07.020.
Frequently Asked Questions
When does a Lewis County project need a loading zone?
How big does the loading space have to be?
Is my small business exempt from the loading zone requirement?
Sources & Official References
Other rules in Lewis County
Compare Lewis County to another location·View the Washington parking rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.