Key Facts

Small buildings
Loading space 15 x 30 feet, under 20,000 sq ft
Large buildings
Loading space 15 x 45 feet, 20,000+ sq ft
Vertical clearance
Minimum 15 feet
High-volume uses
1 space per 5,000-20,000 sq ft, scaling up
Enforcing agency
Sampson County Zoning Officer
Effective date
February 21, 2025

Summary

Unincorporated Sampson County requires off-street loading space sized to a building's floor area. Loading spaces must be at least 15 by 30 feet for buildings under 20,000 square feet, rising to 15 by 45 feet for larger buildings, and a Zoning Permit or Certificate of Occupancy is withheld until the loading plan is approved.

These county ordinances apply to unincorporated areas of Sampson County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

1. For uses containing a gross floor area of less than 20,000 square feet, each off-street loading space shall have minimum dimensions of fifteen (15) feet in width and thirty (30) feet in length. 2. For uses containing a gross floor area of 20,000 square feet or more, each off-street loading space shall be fifteen (15) feet in width and forty-five (45) feet in length as a minimum. 3. All off-street loading spaces shall have a minimum vertical clearance of fifteen (15) feet.

Full Breakdown

Sampson County Code §§ 2-32-09 through 2-32-11 govern off-street loading in unincorporated Sampson County. Every application for a Zoning Permit or Certificate of Occupancy where loading space is required must show the location and dimensions of driveway entrances, access aisles and loading spaces, plus vehicular and pedestrian circulation and the location of sidewalks and curbs; the Zoning Officer withholds the permit or certificate until those plans meet § 2-32-09, and any certificate already issued becomes void if compliance later lapses. Under § 2-32-10, a loading space serving a building under 20,000 square feet of gross floor area must measure at least 15 feet wide by 30 feet long, and a building of 20,000 square feet or more needs spaces at least 15 feet wide by 45 feet long, each with 15 feet of vertical clearance.

Access aisles must be paved with an all-weather hard surface, loading maneuvers must stay entirely within the property lines, and loading areas next to residentially zoned or used property must be buffered, with lighting shielded so it casts no light on adjacent properties or streets. Section 2-32-11 sets minimum space counts by floor area: large-volume uses such as industrial plants, wholesale establishments and freight terminals need one space at 5,000 to 20,000 square feet, rising to seven spaces at 215,001 to 260,000 square feet and one more for each additional 45,000 square feet, while lower-volume uses like offices, restaurants and hotels need only one space up to 80,000 square feet, scaling to four spaces at up to 500,000 square feet.

Violations & Fines

The Zoning Officer reviews loading plans before issuing a Zoning Permit or Certificate of Occupancy and can withhold or void either if the § 2-32-09 through 2-32-11 loading requirements are not met. A property owner who disputes a determination may appeal to the Sampson County Planning Board under G.S. 160D-405 and then to superior court under G.S. 160D-1402, and unresolved violations are subject to penalties and remedies under G.S. 160D-404 and G.S. 153A-123.

Frequently Asked Questions

How big must a loading space be for a small commercial building in unincorporated Sampson County?
For a building under 20,000 square feet of gross floor area, § 2-32-10 requires each off-street loading space to measure at least 15 feet wide and 30 feet long, with at least 15 feet of vertical clearance.
How many loading spaces does a warehouse need?
Section 2-32-11 scales loading spaces to floor area for high-volume uses like warehouses and freight terminals: one space for 5,000 to 20,000 square feet, up to seven spaces for 215,001 to 260,000 square feet, and one more for each additional 45,000 square feet.
Can the county block my occupancy permit over loading space?
Yes. Section 2-32-09 lets the Zoning Officer withhold a Zoning Permit or Certificate of Occupancy until the loading plan meets the ordinance, and an already-issued certificate becomes void if the property later falls out of compliance.

Sources & Official References

Other rules in Sampson County

All Sampson County rules

Compare Sampson County to another location·View the North Carolina parking rules overview

Get notified when Loading Zones in Sampson County, NC changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.