Tippecanoe County, IN Parking Rules: Loading Zones (2026)
Key Facts
- Berths required
- 1 per 10,000 sq ft up to 160,000
- Above 160,000 sq ft
- +1 berth per 80,000 sq ft
- Intersection setback
- No berth within 25 ft of intersection
- Zone alternative
- NBU/CB/CBW may use zone within 130 ft
- Tractor-trailer berth cap
- 14' x 60', 15' clearance
- Screening
- 8 ft noise barrier plus evergreen planting
- Penalty
- $50-$1,500 fine per day violated
Summary
Tippecanoe County's Unified Zoning Ordinance requires new or substantially altered buildings that receive or distribute goods by truck to provide off-street loading berths, sized by a formula tied to gross floor area. The Administrative Officer sets berth count, placement and screening, and in the NBU, CB and CBW business zones a certified public loading zone can substitute for on-site berths.
(a) The Administrative Officer shall determine the need for loading berths to be provided for newly erected or substantially altered buildings which receive or distribute materials or merchandise by truck, up to the maximums shown in 4-6-18-a-1 below. ... (b) Unless certified by the Administrative Officer under 4-6-18-c below, required off-street loading berths shall be located on the same lot as the use to be served. No portion of any vehicle using the loading berth shall project into a street or alley. No permitted or required loading berth shall be located within 25' of the nearest street intersection, nor shall it be located in a required front, side or no-parking setback adjoining a street. (c) In NBU, CB, and CBW zones, the Administrative Officer may certify that there is a designated street or alley loading zone within 130' of the development. In that case, no off-street loading berth need be provided. However, if no off-street loading berth is provided, all pick-ups and deliveries shall be made using the certified street or alley loading zone.
Official source re-checked September 8, 2026: the cited page had not changed since it was quoted.
Full Breakdown
Section 4-6-18 of the Unified Zoning Ordinance ties the number of required loading berths to gross floor area: one berth for up to 10,000 square feet, two for 10,001-40,000, three for 40,001-80,000, four for 80,001-120,000, five for 120,001-160,000, and one additional berth for every 80,000 square feet above 160,000. Berths must sit on the same lot as the use served, no vehicle may project into a street or alley, and no berth may be located within 25 feet of the nearest street intersection or inside a required front, side, or no-parking setback along a street.
In the NBU, CB, and CBW zones, the Administrative Officer can certify a designated street or alley loading zone within 130 feet of the development in place of an on-site berth, but then all pick-ups and deliveries must use that certified zone. Berths for tractor-trailers are capped at 14 feet wide by 60 feet long with a 60-foot maneuvering apron (120 feet total depth) and 15 feet of vertical clearance; berths for single-unit trucks are capped at 12 feet by 30 feet with a 30-foot apron (60 feet total depth) and 12 feet of clearance.
Loading areas must be screened from adjacent residential zones with a dense evergreen or mixed planting plus a noise barrier structure at least 8 feet tall, except in the CB and CBW zones where screening is not required. Berths and maneuvering aprons must be paved except in the A, AA, AW, and FP zones and on farms, where paving is optional. This ordinance was adopted for unincorporated Tippecanoe County on November 24, 1997 (Ordinance No. 97-51CM) and is current through Amendment 124.
Violations & Fines
Under Section 6-3-1, an owner or possessor who violates the loading berth requirements or fails to comply is fined between $50 and $1,500 per determination of violation, with each day the violation continues counted as a separate offense. The Area Board of Zoning Appeals or the Administrative Officer can order removal of the offending structure or use, sue in Tippecanoe County circuit or superior court to enjoin the violation, declare the property a common nuisance, and recover attorney's fees and court costs. No new permit or land use petition may be filed on a property with an unresolved violation.
Frequently Asked Questions
How many loading berths must a new commercial building have in Tippecanoe County?
Can a Tippecanoe County business skip building its own loading berth?
How close to a street corner can a loading berth sit?
What is the penalty for violating Tippecanoe County's loading berth rule?
Sources & Official References
Other rules in Tippecanoe County