Decatur, GA Public Health Rules: Rodent Control (2026)
Key Facts
- Requirement
- pest control certification before demolition permit issues
- Governing section
- UDO § 10.1.1(G)(2)
- Certifier
- State-licensed Pest Control Agency
- Verification
- Building Official must receive proof of certification
- Also required pre-demolition
- hazardous material forms, utility disconnection
- Penalty for noncompliance
- Code of Ordinances § 1-12
Summary
Before any structure comes down in the City of Decatur, Georgia, the owner must have a state-licensed pest control agency certify the premises are free of vermin and rodent infestation, or that any infestation found has already been abated, under UDO Sec. 10.1.1(G)(2).
Demolition of any structure shall not begin until all of the following conditions are satisfied: ... A State-licensed Pest Control Agency has certified, and the Building Official has received verification, that the premises do not show or contain evidence of vermin and/or rodent infestation that would be disturbed or migrate from the premises during demolition and that abatement of any evident infestation condition has been accomplished prior to demolition.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 28).
Full Breakdown
Decatur's demolition rule is narrow but specific: UDO Sec. G lists four conditions that must all be satisfied before demolition of any structure begins, and the second is the pest control requirement. A State-licensed Pest Control Agency must certify, and the Building Official must receive verification of that certification, that the premises show no evidence of vermin or rodent infestation that would be disturbed or migrate off-site during demolition, and that any infestation actually found has been abated first. The other three conditions round out the demolition checklist: a demolition permit that folds in any required Erosion and Sedimentation Control or Tree Conservation Plan, a State-licensed hazardous material abatement contractor's lead-based paint and asbestos program forms filed with the Georgia Environmental Protection Division along with approved landfill invoices, and confirmation that all utilities are terminated and capped at the right-of-way.
This is a demolition-permit condition, not a standalone rodent ordinance; Decatur's broader unsanitary-premises rule at Code Sec. 54-56 bars owners from keeping weeds, garbage, trash or dead limbs that create an unsanitary or dangerous condition, but that section does not name rodents or vermin specifically, so the certification requirement in Sec. 2 is the only provision in the code that speaks to rodent infestation by name.
Violations & Fines
The Building Official will not authorize demolition to proceed without documented verification of the pest control certification along with the other three Sec. 10.1.1.G conditions. Demolishing a structure without satisfying this requirement is a violation of Article 10 of the UDO, punishable as provided in Section 1-12 of the Code of Ordinances, the City's general penalty provision for code violations.
Frequently Asked Questions
Does Decatur, Georgia require a pest inspection before tearing down a building?
What else must happen before a demolition permit issues in Decatur?
Is there a general rodent ordinance for Decatur properties outside demolition?
Sources & Official References
Other rules in Decatur
Compare Decatur to another location·View the Georgia public health rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.