Skip to main content
CityRuleLookup

Decatur, GA Parking Rules: Loading Zones (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Minimum berth size
12 by 35 feet, 14 ft clearance
Small retail/industrial
1 loading space required
Large retail ratio
1 space per 20,000 sq ft
Office/hotel ratio
1 berth per 100,000 sq ft
Industrial at 400,000 sq ft
6 loading spaces required
MU district loading docks
Must be screened from ROW

Summary

The City of Decatur, Georgia's Unified Development Ordinance requires most nonresidential development to provide off-street loading space sized to at least a 12-by-35-foot berth with 14 feet of overhead clearance under Section 7.1.4. Larger industrial and wholesale buildings scale up on a tiered table, from one loading space at 10,000 square feet to six spaces at 400,000 square feet.

Where required, one or more off-street loading berths or spaces shall be provided on the same or adjoining lot with the facility it serves, either inside or outside a building. A loading berth shall have minimum dimensions of 12 feet by 35 feet by 14 feet overhead clearance. A loading space need not be a full berth but shall be sufficient to allow normal loading operations appropriate to the property served. The UDO Administrator shall determine the sufficiency of the space, but in no case shall this space or its use hinder the free movement of vehicles and pedestrians over a street or sidewalk. ... D.Industrial and Wholesale Operations With a Gross Floor Area of 10,000 Square Feet or More ... Loading Requirements Facility Size (gross floor area) Required loading 10,000-40,000 sq. ft. 1 space 40,000-100,000 sq. ft. 2 spaces 100,000-160,000 sq. ft. 3 spaces ... H.Loading Dock Entrances for Nonresidential Uses ... Loading dock entrances for nonresidential uses shall be screened so that loading docks and related activity are not visible from any public right-of-way.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 28).

Full Breakdown

4 of the Decatur UDO sets the baseline: where loading is required, one or more off-street loading berths or spaces must sit on the same or an adjoining lot as the use it serves, either inside or outside a building. A full loading berth must measure at least 12 feet by 35 feet with 14 feet of overhead clearance, though a lesser loading space is acceptable if the UDO Administrator finds it sufficient for the property's normal loading operations; in every case the space cannot block the free movement of vehicles or pedestrians on a street or sidewalk.

The section then sets use-specific ratios. Retail operations, including restaurant space inside hotels and office buildings, with 20,000 square feet or more devoted to those purposes need one loading space per 20,000 square feet of gross floor area (or fraction) and one full loading berth per 40,000 square feet. Smaller retail and first-floor nonresidential uses under 20,000 square feet, along with wholesale and light industrial uses under 10,000 square feet, need just one loading space. Office buildings and hotels need one berth per 100,000 square feet.

Industrial and wholesale operations of 10,000 square feet or more follow a tiered table: one space from 10,000 to 40,000 square feet, two spaces up to 100,000 square feet, three up to 160,000, four up to 240,000, five up to 320,000, six up to 400,000, and one additional space for every 100,000 square feet beyond that. H requires that loading dock entrances for nonresidential uses be screened so that loading docks and related activity are not visible from any public right-of-way, a design rule layered on top of the citywide space count.

Violations & Fines

Developing or operating a nonresidential use without the loading space or berth count Section 7.1.4 requires for its floor area is a site development standard violation the UDO Administrator can flag during permit review or site plan approval, which can delay or block a certificate of occupancy. In the MU district, an unscreened loading dock visible from a public right-of-way violates Section 4.6.5.H and can be cited separately from the citywide loading-count requirement.

Frequently Asked Questions

How big does a loading space have to be in Decatur, Georgia?
A full loading berth must measure at least 12 feet by 35 feet with 14 feet of overhead clearance under Section 7.1.4. A smaller loading space can qualify instead if the UDO Administrator determines it is sufficient for the property's normal loading operations.
How many loading spaces does a large warehouse need?
Industrial and wholesale buildings of 10,000 square feet or more follow a tiered table in Section 7.1.4.D: one space up to 40,000 square feet, rising to six spaces at 400,000 square feet, plus one more for every additional 100,000 square feet beyond that.
Can a loading dock face a public street in Decatur?
Not in the MU Mixed-Use District. Section 4.6.5.H requires loading dock entrances for nonresidential uses there to be screened so the dock and related activity are not visible from any public right-of-way, a rule layered on top of the citywide space count.

Sources & Official References

Other rules in Decatur

All Decatur rules

Compare Decatur to another location·View the Georgia parking rules overview

Get notified when Loading Zones in Decatur, GA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.