Darlington County, SC Sidewalk & Pedestrian Rules: Encroachment Permits (2026)
Key Facts
- Permit required for
- Utility lines and construction in county right-of-way
- Application lead time
- At least two weeks before desired permit date
- Permit fee
- $25.00 (currently suspended pending review)
- Permit validity
- 6 months, one 6-month extension allowed
- Issuing authority
- County administrator's office
Summary
Anyone installing utility lines or doing construction work within a Darlington County right-of-way must first obtain a written encroachment permit, which costs $25, is valid for six months, and can be extended once for another six months.
Sec. 9. - Conformance. When it is necessary for any individual, corporation, firm and/or their contractors and agents to install or construct utility lines, services, and appurtenances within a county right-of-way or to pursue any construction operation, a written permit shall be obtained from the county. ... ... Sec. 9.6. - Effective date and extensions. Encroachment permits shall be valid for a period of six months from the date of issue. One extension may be granted by the county administrator upon written request from the applicant not to exceed an additional six months. ... Sec. 9.7. - Fees. ... (Suspended for one year of evaluation.) At the time of filing the application, a $25.00 permit fee to cover the inspection shall be paid to the county administrator's office.
Full Breakdown
Article Nine of the Development Standards Ordinance, Appendix A, requires any individual, corporation, firm, contractor or agent installing utility lines, services, or appurtenances in a county right-of-way, or pursuing any construction operation there, to obtain a written permit under Section 9. If a state permit already covers the work, a separate county permit is not required except for the portion of work solely on county right-of-way. Agricultural encroachment is not exempt and remains subject to enforcement if unpermitted, per the note appended to Section 9.
Section 9.1 requires applicants to submit a drawing of the proposed work at least two weeks before the desired permit date, though simple service connections receive priority handling and are returned within seven days. Section 9.2 sets construction standards: road cuts in paved surfaces are barred except by permission of the roads and bridges supervisor for specific reasons such as impractical boring or safety hazards, and any authorized cut must be restored to the roadway specifications in Article Five. Section 9.6 fixes the permit term at six months from issuance, with one six-month extension available on written request; further work requires a new application.
Section 9.7 sets the fee at $25 to cover the county's inspection cost, though that fee section is currently marked suspended pending a one-year evaluation. Section 9.3 exempts routine overhead connections, minor underground service taps on the ditch back-slope, and normal maintenance replacing under 300 feet of line from the permit requirement.
Violations & Fines
Failure to comply with the permit's conditions is grounds for revocation of the permit and denial of future permits to the same contractor or developer under Section 9.5; the county administrator can also require the road closed only with written permission, and unauthorized closures or uncorrected defects can trigger revocation after 24 hours' notice.
Frequently Asked Questions
Do I need a permit to dig in a Darlington County road right-of-way?
How long does a Darlington County encroachment permit last?
What does a Darlington County encroachment permit cost?
Sources & Official References
Other rules in Darlington County
Compare Darlington County to another location·View the South Carolina sidewalk & pedestrian rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.