Skip to main content
CityRuleLookup

Greeley, CO Sidewalk & Pedestrian Rules: Encroachment Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit issued by
Director of public works
Covers
Sidewalks, curbs, driveways, curb cuts
Contractor license
Required for the work
Citation
Greeley Municipal Code § 18-2

Summary

Before building or altering a sidewalk, curb, driveway or curb cut in a Greeley public right-of-way, owners and contractors must get a permit from the director of public works.

No person, either as owner or as a public right-of-way contractor, shall commence the construction, installation, alteration or repair of any sidewalk, curb, gutter, driveway, curb cut, street, alley or any other improvement in or under a public right-of-way, in the city or in subdivisions or other areas subject to contract with the city for water or sewer service, without first obtaining a permit with respect to such work in accordance with this section and sections 18-3 and 18-4. In the event physical alterations to the public right-of-way are performed, such work shall be in conformance to the city's requirements of the engineering design standards and construction specifications and specifications governing utility cuts and excavation.

(Prior Code, § 19-19(a); Code 1994, § 13.04.010; Ord. No. 45, 2016, § 1(exh. A), 12-20-2016)

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Municipal Code: Supplement 6 Update 1).

Full Breakdown

Greeley Municipal Code § 18-2 bars anyone -- property owner or public right-of-way contractor -- from starting construction, installation, alteration or repair of a sidewalk, curb, gutter, driveway, curb cut, street, alley or any other improvement in or under a public right-of-way without first getting a permit from the director of public works. Applications under § 18-3 need detailed plans, proof the applicant isn't delinquent on past city work, liability insurance naming the city, payment of the § 18-4 permit fee, and evidence of a valid city public right-of-way contractor's license before work can begin.

Violations & Fines

Starting right-of-way work without the required permit is a code violation; contractors also risk losing their public right-of-way contractor's license for unpermitted or defective work.

Frequently Asked Questions

Do I need a permit to put in a driveway cut in Greeley?
Yes. Greeley Municipal Code § 18-2 requires a right-of-way permit from the director of public works before any driveway, curb cut or other improvement is built in the public right-of-way.
Who can do the work?
Only a licensed public right-of-way contractor, or the property owner directly, and the permit application must include insurance naming the city and payment of the permit fee.

Sources & Official References

Other rules in Greeley

All Greeley rules

Compare Greeley to another location·View the Colorado sidewalk & pedestrian rules overview

Get notified when Encroachment Permits in Greeley, CO changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.