Houston County, GA Sidewalk & Pedestrian Rules: Encroachment Permits (2026)
Key Facts
- Permit needed for
- Driveway/access entrances, pipe work
- Permit fee
- $25.00
- Where to apply
- Building official or public works
- Spec turnaround
- 2 consecutive working days
- Uncleared obstruction
- County removes after 30 days' notice
Summary
Any driveway, access entrance, or pipe installation touching a Houston County road right-of-way needs a permit under General Code Sec. 54-36, applied for through the building official's office or public works department. The permit costs $25.00 and covers two required inspections.
All applicants for a permit under this article shall be required to apply for ingress or egress authorization in order to access the county right-of-way for pipe installation purposes. The encroachment regulations shall cover the following:(1)All driveway or access entrances from any county road or street must have a permit from the county. This includes modifications to existing driveways, headwalls, decorative entrance work, plantings and other like additions.
Full Breakdown
Sec. 54-36, Encroachment on right-of-way, requires anyone seeking ingress or egress access to a county right-of-way for pipe installation to apply for encroachment authorization. Under Sec. 54-36(1), all driveway or access entrances from a county road or street, including modifications to existing driveways, headwalls, decorative entrance work and plantings, need a county permit. Sec. 54-36(2) bars temporarily filling drainage ditches for site access and bars placing debris, excavation material or building materials on the right-of-way at construction sites without an engineer-approved grading plan. Applications go to the county building official's office or public works department under Sec.
54-35(a), must include the applicant's name, phone number and the installation site's address or location description (Sec. 54-35(b)), and the site must be inspected to determine pipe size and installation procedure (Sec. 54-35(c)); the county allows two consecutive working days to set piping specifications (Sec. 54-35(d)). Sec. 00, covering the site investigation/pipe-size inspection and the final inspection before the driveway surface is poured. Mailbox and newspaper box installations on arterial roads also require building inspection department approval under Sec. 54-36(4), and no basketball goals may be placed on any county right-of-way under Sec. 54-36(5).
Violations & Fines
Failing to obtain a required encroachment or driveway permit, or violating the placement standards, exposes the property owner to removal costs: under Sec. 54-36(6), after written certified-mail notice, the county removes an unpermitted obstruction if it is not cleared within 30 days, and the removal cost becomes a lien against the property.
Frequently Asked Questions
Do I need a permit to install a driveway pipe in Houston County?
How much does a Houston County right-of-way encroachment permit cost?
What happens if I block the county right-of-way without a permit?
Sources & Official References
Other rules in Houston County
Compare Houston County to another location·View the Georgia sidewalk & pedestrian rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.