Skip to main content
CityRuleLookup

La Plata County, CO Sidewalk & Pedestrian Rules: Encroachment Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Issuing office
La Plata County Public Works Department
Permit term
One year, renewable once for one year
Bond
$5,000 or 115 percent of restoration cost, whichever is greater
Advance notice
14 calendar days before construction starts
Underground utility depth
At least two feet below ground surface
Overhead line clearance
18 feet where lines cross public streets
Unpermitted work
Penalty fee (Appendix A) and stop work order

Summary

In unincorporated La Plata County, Colorado, no one can construct or improve a road, drainage, utility or other facility inside a county right-of-way without a permit from the Public Works Department. Permits last one year with one one-year renewal, require a bond of at least $5,000, and carry a penalty fee if work starts without one.

These county ordinances apply to unincorporated areas of La Plata County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

I. County right-of-way permit. ... A. Permit required. ... No person shall construct or improve any road, drainage, utility or other infrastructure or facilities within a county right-of-way without first obtaining a permit from the public works department. A permit shall pertain only to the work authorized and the permittee shall not enter onto private property or alter or disturb any private facilities or installations within the right-of-way. B. Term of permit. County right-of-way permits are valid for one (1) year but may be renewed for one additional one (1) year period, provided the renewal is obtained prior to the date of expiration. The failure to obtain a timely renewal shall result in an expiration of the existing permit and a new permit and application fee shall be required. ... ... I. Penalty fee for working without written authorization. Any person commencing any work within a county road right-of-way without a valid county road right-of-way permit shall be required to pay a penalty fee as set forth in Appendix A of this code.

Full Breakdown

Section 74-9 of the La Plata County Code, adopted by the Board of County Commissioners, puts the Public Works Department in charge of every permit for work in a county right-of-way. The code calls the document a county right-of-way permit rather than an encroachment permit, and it covers third-party work in the right-of-way, driveway access and utility construction. A permit covers only the work it authorizes, and the permittee cannot enter private property or disturb private facilities or installations inside the right-of-way.

Each permit is valid for one year and can be renewed for one additional one-year period if the renewal is obtained before expiration. Miss that date and the permit expires, so a new permit and a new application fee are required. Before issuance the applicant posts a non-cancelable permit bond, issued by a corporate surety licensed in Colorado, for $5,000 or 115 percent of the amount needed to restore the right-of-way, whichever is greater. The county can recover expenses for 365 days after the permit expires. At the public works director's discretion, municipalities, quasi-municipal agencies, ditch companies and electric, gas and communications utilities can file a letter of responsibility instead of a bond.

The construction rules are specific. The road must be returned to a condition equal to or better than the original. Road cuts are barred unless the director finds that subsurface conditions preclude boring. Backfill in the roadway's structural section is flowable fill up to within six inches of the surface, or engineered backfill with compaction testing. Underground utility lines go at least two feet below the ground surface, and overhead lines need 18 feet of ground clearance where they cross public streets. The applicant gives the public works director at least 14 calendar days' notice before construction starts and submits a proposed schedule. Only one side of a road can be blocked at a time unless the department approves closing both sides in advance. Emergency repairs still need a permit, but the application can be delayed 48 hours, excluding weekends and holidays. The director releases the security after the applicant certifies completion, including drainage, connections and a cleared roadside.

Violations & Fines

Starting any work in a county road right-of-way without a valid permit triggers a penalty fee set in Appendix A of the code. Public Works can also issue a stop work order to anyone who worked without a permit or left a cut that settled, failed or was not repaired to county standards. Work halts except emergency repairs, and no new permits issue until the repair is made or the county is reimbursed. The county can make the repair itself and bill an administrative charge plus labor, materials and equipment costs.

Frequently Asked Questions

Who issues a right-of-way permit in unincorporated La Plata County?
The Public Works Department issues it, and the public works director decides bonds, specifications, road cuts and inspections. The permit is required before anyone constructs or improves a road, drainage, utility or other infrastructure or facility inside a county right-of-way. Section 74-9 covers county rights-of-way, so it is the county's permit, not one from a city or town.
How long does the permit last and can it be renewed?
A county right-of-way permit is valid for one year and can be renewed for one additional one-year period, as long as the renewal is obtained before the expiration date. If the renewal is late, the existing permit expires and a new permit and a new application fee are required.
Does the county require a bond for work in the right-of-way?
Yes. A non-cancelable permit bond must be in place before the permit is issued, in the amount of $5,000 or 115 percent of the cost to restore the right-of-way as set by the public works director, whichever is greater. Municipalities, ditch companies and electric, gas and communications utilities can ask the director to accept a letter of responsibility instead.
Can I make an emergency repair before getting the permit?
Emergency repairs still need a county road right-of-way permit, but the application can be delayed 48 hours, excluding weekends and holidays, after the repairs begin before the penalty fee can be assessed. Traffic control during the emergency must follow the MUTCD standards named in the code.
Is a separate permit needed for a cattle guard?
Yes. Under section 74-9, no person can install, construct or remove a cattle guard in a county right-of-way without first obtaining a permit from the Public Works Department. The director reviews the application, inspects the site, and bases the design on CDOT cattle guard specifications.

Sources & Official References

Other rules in La Plata County

All La Plata County rules

Compare La Plata County to another location·View the Colorado sidewalk & pedestrian rules overview

Get notified when Encroachment Permits in La Plata County, CO changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.