Yuba County, CA Sidewalk & Pedestrian Rules: Encroachment Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Permit required for
Excavation, driveways, sidewalks, signs, tree work in ROW
Issuing office
Public Works Dept., ex officio Road Commissioner
Fee basis
Set by § 13.20.600, covers processing and insurance
Annual permit cap
$1,500 per job for routine minor work
Work start deadline
30 days after issuance, up to 60 by Commissioner
Penalty
Misdemeanor: up to $1,000 fine, 6 months jail
Appeal
Denied applicants may seek Board of Supervisors review

Summary

Before excavating, building a driveway, installing sidewalks or curbs, planting or removing street trees, or placing signs in a County road right-of-way in unincorporated Yuba County, you need an encroachment permit from the Public Works Department under Yuba County Code § 9.50.020. An unpermitted advertising sign in the right-of-way is a public nuisance the Road Commissioner may remove immediately.

These county ordinances apply to unincorporated areas of Yuba County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

9.50.020. - Permit; required. No person shall do or cause to be done any of the following enumerated things without first obtaining a permit therefor and complying with all conditions thereof and all provisions of this Chapter: (1)Excavate or fill in an excavation within a road right-of-way.(2)Install, construct, maintain, cut into, repair or remove any sidewalks, driveways, curbs, gutters, road approaches, or road surfacing; or install, repair or remove any facilities or substructures in, on, over, or under any road right-of-way.(3)Place, change or renew an encroachment.(4)Place, or display in, under or over any County highway any kind of advertising sign or device. Any such sign or device placed or displayed contrary to the provisions of this Section is a public nuisance and the Road Commissioner may immediately remove it. The provisions of this Section shall not prohibit the posting of any notice in the manner required by law or by the order of any court of this state.(5)Plant, remove, cut, cut down, injure or destroy any tree, shrub, plant or flower growing within any County highway.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 6).

Full Breakdown

020 requires a permit before anyone excavates or fills within a road right-of-way, installs, cuts into, repairs or removes sidewalks, driveways, curbs, gutters, road approaches or road surfacing, places or renews an encroachment, displays an advertising sign or device in a County highway, or plants, removes or cuts down a tree, shrub, plant or flower growing within one. 010 to include any tower, pole, pipeline, driveway, private road, fence, billboard, stand or building placed in, under or over the highway; the Community Development and Services Agency's Public Works Director acts as ex officio Road Commissioner. 600 to cover processing and County liability insurance. 110). 040). 120). 280). 020(4)).

Violations & Fines

Working without a permit, violating any permit condition, or ignoring a Commissioner's requirement under Chapter 9.50 is a misdemeanor under § 9.50.330, punishable by up to $1,000.00 in fines, up to six months in County Jail, or both. Obstructing a Department inspector or blocking a required sample or test is separately prohibited under § 9.50.300. Failure to post required security can trigger permit suspension, and the Commissioner may complete the work and bill the permittee for the cost.

Frequently Asked Questions

Do I need a permit to put in my own driveway?
Yes. Section 9.50.020 requires a permit before installing, constructing, cutting into or repairing a driveway, sidewalk, curb, gutter, road approach or road surfacing in a County road right-of-way. Apply through the Public Works Department on the Commissioner's approved form and pay the processing fee set in § 13.20.600 before starting work.
Can the County make me remove an illegal sign from the right-of-way?
Yes. Any advertising sign or device placed or displayed in a County highway without a permit is declared a public nuisance under § 9.50.020(4), and the Road Commissioner may remove it immediately, unless it is a notice posted as required by law or by court order.
How long do I have to start work once I get a permit?
You must commence work within 30 days of the permit being granted, or within whatever longer period up to 60 days the Commissioner sets (§ 9.50.190). Special single permits under § 9.50.040 run on the same 30-day clock from their effective date; unexcused delay lets the Commissioner terminate or suspend the permit.
What happens if the Commissioner denies my permit?
You can apply to the Board of Supervisors for review under § 9.50.280. If the Board finds you were not actually in default on a prior permit, it can order the Commissioner to issue the permit you were denied.

Sources & Official References

Other rules in Yuba County

All Yuba County rules

California rules heatmap·Compare Yuba County to another location·View the California sidewalk & pedestrian rules overview

Get notified when Encroachment Permits in Yuba County, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.