Palm Bay, FL Sidewalk & Pedestrian Rules: Encroachment Permits (2026)
Key Facts
- Permit issuer
- Public Works Department
- Covered work
- Curb, driveway, sidewalk, gutter, ROW
- Permit term
- Expires in 90 days
- Fee escalation
- +4% each fiscal year
Summary
Any construction, alteration, or access to a curb, driveway, sidewalk, or gutter within a Palm Bay street or easement requires a driveway permit from Public Works.
No person, firm, corporation, or governmental agency shall construct, remove, alter, reconstruct, access the right-of-way temporarily or permanently, repair, or relocate any curb, culvert, sidewalk, driveway, gutter, pavement, or other improvement in any city road or easement without obtaining a driveway permit from the Public Works Department. When a driveway or other existing improvement has relocated, changed, or abandoned, making any portion or the entire driveway or other improvement unnecessary, the owner of the abutting property shall obtain a permit and shall remove the driveway or other improvement and shall, at his own expense, install or replace all necessary curbs, gutters, culverts, and sidewalks.
(A) Permit procedure.
(1) Application procedure. Application for a driveway permit shall be made to the City Manager or designee on forms provided. Each applicant shall provide the information and drawings specified on the permit application for the particular type of improvement. Additionally, each applicant shall be required to agree to maintain the constructed improvements and to hold the Council harmless for any liability arising from failing to maintain or from improperly maintaining the improvement.
(2) Issuance of permit. Upon receipt of the application and drawings, the City Manager or designee shall review the application and determine compliance with the location, drainage, construction, and traffic engineering
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2026 S-41: Supplement contains: Local legislation current through Ord. 2026-13, passed 5-21-26).
Full Breakdown
Section 176.020 makes it unlawful for any person, firm, corporation, or governmental agency to construct, remove, alter, reconstruct, repair, relocate, or even temporarily access a curb, culvert, sidewalk, driveway, gutter, pavement, or other improvement within a city road or easement without first obtaining a driveway permit from the Public Works Department. Applicants must agree to maintain the improvement and hold the city harmless for maintenance-related liability. Permits expire 90 days after issuance, and permit fees increase 4% each fiscal year unless the city sets a decrease.
Violations & Fines
Unauthorized right-of-way work has no automatic fine listed in this section, but the city can require removal and restoration at the responsible party's expense, and a lapsed 90-day permit must be reapplied for before work continues.
Frequently Asked Questions
Do I need a permit to build or repair a driveway in Palm Bay?
How long is a Palm Bay driveway/right-of-way permit valid?
Sources & Official References
Other rules in Palm Bay
Florida rules heatmap·Compare Palm Bay to another location·View the Florida sidewalk & pedestrian rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.