Permit issuer
Director of public works
Maximum permit length
180 days
Performance bond required
$10,000.00
Primary street fee (8-180 days)
$130.00 per lane, per day
Restoration deadline
60 days after work completion

Summary

Anyone who wants to occupy a Peoria street, alley or sidewalk for construction, storage or a dumpster needs a right-of-way occupancy permit from the director of public works, backed by a $10,000 performance bond and daily fees that vary by street type.

Sec. 26-29. - Consent to temporarily occupy right-of-way. (a)Permit required. The director of public works is empowered to issue a right-of-way occupancy permit for any use of city streets or other public property. The permit may be issued for such use as the director of public works, in his sole discretion, deems necessary, up to a maximum of 180 days.(b)Preconditions. No permit shall be issued until:(1)Proof of performance bond in the amount of $10,000.00.(2)A traffic control plan, in compliance with the Uniform Manual on Traffic Control Devices, has been approved by the director of public works.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 119).

Full Breakdown

Sec. 26-29 empowers the director of public works to issue a right-of-way occupancy permit for any use of city streets or other public property, for up to a maximum of 180 days, at the director's sole discretion. 00 performance bond and an approved traffic control plan that complies with the Uniform Manual on Traffic Control Devices. 00 per day, waived entirely if the adjacent street closure is permitted for the same days. 00 per 30 days, and that application must come from whoever is placing the dumpster or container, not necessarily the property owner.

Within 60 days of finishing the permitted work, the permit holder must restore the right-of-way to its prior condition or better, or the city will do the restoration and bill the full cost to the permittee. The director may waive fees for a city-funded project or negotiate a special rate for long-term construction, and may revoke the permit outright for noncompliance.

Violations & Fines

Occupying a Peoria street, sidewalk or other public property under Sec. 26-29 without the permit, an approved traffic control plan, or the $10,000.00 performance bond exposes the occupant to permit revocation, city-performed restoration billed back at full cost, and additional daily fees for every day the right-of-way is not vacated on time.

Frequently Asked Questions

Does a Peoria dumpster placed on the street need a permit?
Yes. Sec. 26-29(d)(2) treats parking-lane use for equipment, dumpsters or portable storage as a right-of-way occupancy requiring a $20.00 fee per 30 days, applied for by whoever is placing the dumpster or container.
What bond does Peoria require to occupy a right-of-way?
Sec. 26-29(b)(1) requires proof of a performance bond of $10,000.00 before the director of public works will issue a right-of-way occupancy permit, in addition to an approved traffic control plan and any applicable fee.
How long is a Peoria right-of-way occupancy permit good for?
Sec. 26-29(a) caps the permit at a maximum of 180 days, issued at the sole discretion of the director of public works, with restoration of the right-of-way required within 60 days after the permitted work is finished.

Sources & Official References

Other rules in Peoria

All Peoria rules

Compare Peoria to another location·View the Illinois sidewalk & pedestrian rules overview

Get notified when Encroachment Permits in Peoria, IL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.