Skip to main content
CityRuleLookup

Richland County, SC Sidewalk & Pedestrian Rules: Encroachment Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit issued by
county engineer's office
Max street width opened at once
one-half (1/2)
Failure-to-maintain period
1 year
Covers
curb cuts, utility taps, drainage lines, signs
Cost recovery on default
charged against permit bond

Summary

Digging, tapping utilities, or cutting a curb along a county road in unincorporated Richland County requires an encroachment permit from the county engineer's office before work starts, and the permit holder must indemnify the county for any resulting damage.

City-specific rules exist: Columbia has its own encroachment permits rules that differ from Richland County's county-level regulations. If you live in Columbia, check the city-specific page instead.

(a) Generally. (1) An encroachment permit, approved by the county engineer's office, shall be required for all construction, undertaken by parties other than the county public works department or its authorized contractor, within or affecting the right-of-way of any county maintained highway, street or road... (2) The permittee shall indemnify the county for any liability incurred or damages sustained as a result of the encroachment. (b) Excavations in streets. (1) An encroachment permit shall be required for each excavation in a county road before the work is commenced... There shall be no more than one-half (1/2) the width of any street or alley opened or obstructed at any one time; tunneling may be allowed, provided that no authorized underground construction shall be damaged or interfered with.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2026 S-24: This supplement is current through Ordinance No. 033-25HR).

Full Breakdown

Sec. 21-24 requires an encroachment permit, approved by the county engineer's office, for any construction within or affecting the right-of-way of a county-maintained highway, street or road when the work is done by someone other than the county's own public works department or its authorized contractor. The section lists specific triggers: driveway connections involving a curb cut or pipe installation, curb cuts generally, utility taps, utility installations, excavations within the right-of-way, storm drainage installation, storm drainage discharge, and subdivision entrance signs or gateways, though the list is explicitly non-exclusive.

The permittee must indemnify the county for any liability or damages the encroachment causes, notify the county engineer's office when construction begins, keep a copy of the permit on site during the work, and ensure the county engineer's office approves both the construction and the roadway restoration. Subsection (b) adds street-excavation specifics: work must start within the time the permit specifies or the permit becomes void, no more than half the width of a street or alley may be opened or obstructed at one time (tunneling is allowed instead), and any paving removed for the excavation must be restored to as good a condition as before, with the permit holder required to notify public works in writing when the trench is refilled, tamped, and ready for repaving.

A permit holder who fails to properly refill an excavation, or fails to maintain the repair for a full year, faces the county doing the work itself and charging the cost against the bond posted for the permit.

Violations & Fines

A permittee who fails to refill an excavation properly or maintain it for one year has the work completed by the county at the permittee's expense, charged against the bond posted when the permit was issued. The permittee also bears indemnification liability for any damage the encroachment causes to the county's right-of-way.

Frequently Asked Questions

Do I need a permit to cut a curb for my driveway in unincorporated Richland County?
Yes. Sec. 21-24(a) requires an encroachment permit from the county engineer's office for driveway connections involving a curb cut or pipe installation before any work begins within the county road right-of-way.
How much of the street can a contractor block during a utility excavation?
No more than one-half the width of the street or alley may be opened or obstructed at one time under an encroachment permit; tunneling is allowed as an alternative if underground construction is not damaged.
What happens if I don't properly restore the road after excavating?
Under Sec. 21-24(b), if you fail to refill the excavation properly or fail to maintain it for one year, the county will do the work itself and charge the cost against the bond you posted when the encroachment permit was issued.

Sources & Official References

Other rules in Richland County

All Richland County rules

Compare Richland County to another location·View the South Carolina sidewalk & pedestrian rules overview

Get notified when Encroachment Permits in Richland County, SC changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Encroachment Permits in Cities Across Richland County