St. Peters, MO Sidewalk & Pedestrian Rules: Encroachment Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit required
Before any right-of-way facilities work
Issuing office
City Engineer
Normal business hours
8:30 a.m. to 5:00 p.m. weekdays
Emergency work
Permit due next business day
Unpermitted work penalty
Double the normal permit fee
Repair deposit
Applicant must fund right-of-way repair costs

Summary

In the City of St. Peters, Missouri, anyone digging, installing, or altering facilities in a public street, sidewalk, or right-of-way needs a permit from the City Engineer under Section 545.020 before starting work, on top of any building or tree permit already required.

Any person desiring to conduct facilities work within public rights-of-way must first apply for and obtain a permit, in addition to any other building permit, municipal tree and landscape ordinance permit, license, easement or authorization required by law, unless such facilities work must be performed on an emergency basis as set forth in Section 545.020(B)(1). A permit shall be obtained for each project. ... Except in the case of an emergency, any person who, without first having obtained the necessary permit, performs facilities work or excavation in a public right-of-way, in addition to any other penalties provided for the violation of ordinances of this City, must subsequently obtain a permit, pay double the normal fees for said permit, deposit with the City all monies necessary to repair any damage caused by the unauthorized facilities work or excavation to the public right-of-way, and comply with all of the requirements of this Chapter and other City ordinances.

Full Breakdown

Chapter 545 Rights-of-Way Management rules require a permit from the City Engineer before any facilities work, defined to include installing, changing, relocating, removing, or repairing conduit, pipe, cable, or other equipment that requires excavation within the public rights-of-way, which the Code defines to reach the surface, air space, and area below any street, sidewalk, alley, boulevard, or similar City-held property. Section 545.020 requires a separate permit for each project and directs the applicant to file with the City Engineer using standard forms covering the applicant and contractor identity, a site plan showing manholes, poles, conduit depth and size, and the number of road and driveway crossings, insurance certificates, and, where relevant, proof the applicant already holds any FCC or Missouri Public Service Commission approval needed.

Individual water and sewer taps tied to a building permit still need their own permit under this Section. Emergency work is the only work allowed to start before a permit issues, and even then the contractor must notify the City, or the Police Department outside normal business hours of 8:30 a.m. to 5:00 p.m. weekdays, and file the permit application by the next business day. Anyone who performs facilities work or excavation in the right-of-way without first getting a permit, outside a true emergency, must still obtain the permit afterward, pay double the normal permit fee, deposit funds to cover repair of any right-of-way damage the unauthorized work caused, and comply with every other requirement of Chapter 545 and other City ordinances, on top of any other penalty the violation triggers.

Violations & Fines

Digging, installing, or altering facilities in a St. Peters street or sidewalk right-of-way without first obtaining a Section 545.020 permit means the responsible party must still get the permit after the fact, pay double the normal permit fee, and deposit with the City whatever it costs to repair right-of-way damage the unauthorized work caused, on top of any other ordinance penalty.

Frequently Asked Questions

Do I need a City permit to dig in the street right-of-way in St. Peters, Missouri?
Yes. Section 545.020 requires a permit from the City Engineer before any facilities work involving excavation in a public right-of-way, whether it is a utility line, a conduit, or a private service connection tied to a building permit. A separate permit is needed for each project.
What happens if the work is an emergency?
Emergency facilities work can start before a permit issues, but the contractor must notify the City during normal business hours, or the Police Department after hours, and file the permit application by the next business day, then meet every other Chapter 545 requirement to come into compliance.
What is the penalty for right-of-way work done without a permit?
Under Section 545.020(B)(2), the responsible party must still obtain the permit afterward, pay double the normal permit fee, deposit with the City the cost to repair any right-of-way damage caused, and comply with all other Chapter 545 requirements, in addition to any other penalty the City imposes.

Sources & Official References

Other rules in St. Peters

All St. Peters rules

Compare St. Peters to another location·View the Missouri sidewalk & pedestrian rules overview

Get notified when Encroachment Permits in St. Peters, MO changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.