Provo, UT Sidewalk & Pedestrian Rules: Sidewalk Repair (2026)
Key Facts
- Default cost split
- 50% owner / 50% City
- Owner-caused damage
- Owner pays 100% of cost
- Engineer determination deadline
- 15 days of request
- Governing chapter
- Provo City Code Ch. 15.10
Summary
In Provo, abutting property owners split the cost of sidewalk, curb, and gutter repair with the City on a 50/50 basis, unless the owner caused the damage, in which case the owner pays the full cost.
(5) The City Engineer, or the City Engineer's designee, shall within fifteen (15) days of any request, determine as described in Subsection (2) of this Section, if sidewalk, curb, or gutter shall be repaired, removed or replaced, and shall make the allocation described in Subsection (3) of this Section between the landowner and the City of the reasonable costs of repair, removal or replacement. In the absence of the City Engineer's setting forth unique circumstances, as described in Subsection (3) of this Section, it shall be presumed that the proper allocation of costs is payment of fifty percent (50%) by the property owner and payment of fifty percent (50%) by the City.
Official source re-checked September 8, 2026: no newer edition of the code had been published (publisher’s edition: current through Ordinance 2026-17, passed June 9, 2026).
Full Breakdown
080 lets the City repair, reconstruct, or replace sidewalks, curbs, and gutters on public property on its own initiative or at an owner's request, guided by a Mayor-adopted policy covering annual inspection, planning, and prioritization by hazard. The City Engineer weighs broken panels, uneven panel elevations, deteriorated surfaces, hazard findings, and ADA compliance when deciding whether work is needed. When an owner requests out-of-cycle repair, the City can either decline or agree to one of two cost arrangements chosen by mutual agreement: the City supplies all labor and materials with costs split 50/50, or the parties negotiate an equitable split based on the sidewalk segment's unique characteristics and benefit to the property.
If the owner directly or indirectly caused the damage, the repair is treated as a benefit solely to that owner, who then assumes all costs tied to the owner's actions or neglect. The City Engineer or a designee must determine within fifteen days of a request whether repair, removal, or replacement is warranted and set the cost allocation between owner and City. Absent the City Engineer identifying unique circumstances, the code creates a default presumption: the property owner pays fifty percent and the City pays fifty percent of the reasonable repair, removal, or replacement cost. 070.
Violations & Fines
Chapter 15.10 does not set a separate misdemeanor penalty specific to Section 15.10.080; the City's remedy for a non-paying owner is the cost-allocation and billing mechanism itself, with the City Engineer's determination binding absent negotiated agreement otherwise. Owners who caused the defect bear full cost of repair rather than the default 50/50 split.
Frequently Asked Questions
Who pays to fix a broken sidewalk in front of my Provo home?
Can I request sidewalk repair on my own schedule?
Sources & Official References
Other rules in Provo
Compare Provo to another location·View the Utah sidewalk & pedestrian rules overview