Key Facts

System size cap
10 kW AC or 30 kW thermal
Eligible buildings
Single- or duplex-family dwellings only
Inspections required
One Building Division inspection
Reviewing office
Roseville Building Division / Building Official
State mandate
Cal. Gov. Code § 65850.5, deadline Sept. 30, 2015
Grid connection
Separate approval needed from Electric Dept.

Summary

Roseville must administratively approve small residential rooftop solar systems up to 10 kW AC once a complete application meets the Building Division's checklist, with only one inspection required for code-compliant systems.

The following words and phrases as used in this section are defined as follows... "Small residential rooftop solar energy system" means all of the following: a. A rooftop solar electric energy system that is no larger than 10 kilowatts alternating current (AC) rating or 30 kilowatts thermal... c. A solar energy system that is installed on the rooftop of a single- or duplex-family dwelling... F. For a small residential rooftop solar energy system eligible for expedited permit review, only one Building Division inspection shall be required, providing the system is in compliance with all applicable code requirements... H. Upon confirmation by the Building Official of the permit application and supporting documentation being complete and meeting the requirements of the checklist, the Building Official shall administratively approve the application and issue all required permits or authorizations.

Full Breakdown

5's mandate that every city adopt, by September 30, 2015, an expedited, streamlined permitting process for small residential rooftop solar energy systems. 030. The Building Official is directed to develop and publish on the City's website a checklist of all requirements a system must meet to qualify for expedited review. Applicants submit the permit application, checklist documentation, and administrative and building permit fees to the Building Division either in person or electronically, and electronic signatures are accepted in lieu of a wet signature. Before submitting, the applicant must verify, using standard engineering evaluation techniques, that the roof support structure can carry the added wind, seismic, dead and live loads, and must verify at their own cost, using standard electrical inspection techniques, that the existing electrical system (line, load, ground, bonding wiring and panel sizing) can carry the new photovoltaic load.

A complete application that satisfies the checklist is deemed complete; an incomplete one triggers a written correction notice from the Building Official detailing every deficiency and what is still needed. Once the application and supporting documents are confirmed complete, the Building Official must administratively approve it and issue all required permits, and only a single Building Division inspection is required for a compliant system. Administrative approval of the building permit does not itself authorize grid connection: the applicant must separately obtain approval from the City's electric department before interconnecting.

Violations & Fines

Chapter 19.91 sets a review process rather than a fine schedule specific to solar. An incomplete application does not draw a penalty; the Building Official instead issues a written correction notice listing every deficiency so the applicant can resubmit for expedited review. Because the expedited process only applies to systems that meet the chapter's eligibility checklist, a system exceeding 10 kW AC (30 kW thermal), installed on more than a duplex, or exceeding the maximum legal building height under RMC 19.10.030 falls outside Chapter 19.91 and must go through standard building permit review instead of the one-inspection expedited track.

Frequently Asked Questions

How fast can I get a solar permit approved in Roseville?
If your application satisfies the Building Division's published checklist for a small residential rooftop system, the Building Official must administratively approve it and issue all required permits once the submittal is confirmed complete, with only one inspection needed, rather than going through standard multi-step plan review.
What size solar system qualifies for Roseville's expedited process?
Chapter 19.91 covers rooftop systems no larger than 10 kilowatts AC or 30 kilowatts thermal, installed on a single- or duplex-family home, that meet state fire, structural and electrical codes and do not exceed the maximum legal building height set in RMC 19.10.030.
Can I connect my approved solar system to the grid right away?
No. Administrative approval and permit issuance under Chapter 19.91 do not authorize connecting the system to Roseville's electrical grid; the applicant must separately obtain approval from the City's electric department before interconnecting.
What happens if my solar permit application is incomplete?
The Building Official issues a written correction notice detailing every deficiency in the application and any additional information needed, so the applicant can correct and resubmit for expedited review rather than losing eligibility for the streamlined process.

Sources & Official References

Other rules in Roseville

All Roseville rules

California rules heatmap·Compare Roseville to another location·View the California solar energy overview

Get notified when Expedited Solar Permitting in Roseville, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.