Amherst, NY Solar Energy: Panel Permits (2026)
Key Facts
- Building permit
- Required for all systems
- Ground-mount max height
- 20 feet at max tilt
- Tier I ground-mount footprint
- 2,000 sq ft or less
- Tier I setback
- 10 feet side/rear
- Abandonment removal deadline
- 150 days after 12 months idle
Summary
Every solar energy system in Amherst, rooftop or ground-mounted, needs a building permit before installation. A qualified solar installer must do the work, and a Town Building Inspector must sign off before the Certificate of Compliance is issued.
6-10-4. General Requirements. A. Building permits are required for all solar energy systems. B. Qualified Installer. All solar energy systems must be installed by a qualified solar installer and, prior to issuance of a Certificate of Compliance, must be inspected by a Town Building Inspector. In addition, any connection to the public utility grid must be approved by the appropriate public utility.
Full Breakdown
Amherst's Solar Energy Law, added in 2017 and amended in 2020, requires a building permit for all solar energy systems under § 6-10-4(A), with no exemption for small residential rooftop arrays. Section 6-10-4(B) requires that installation be performed by a qualified solar installer, that a Town Building Inspector inspect the system before a Certificate of Compliance is issued, and that any grid interconnection get separate approval from the utility. Roof-mounted systems are permitted in every zoning district with no size threshold beyond the state Uniform Fire Prevention and Building Code, and under § 6-10-5(C) they generally do not need separate site plan approval unless ground-mounted equipment like storage batteries is added.
Panels facing a public right-of-way must sit flush with the roof pitch, no more than 18 inches above the roof surface at the highest edge. Ground-mounted systems are tiered by footprint: Tier I is 2,000 square feet or less and is permitted as an accessory use in every district with only a 10-foot side and rear setback; Tier II runs up to 7,000 square feet; Tier III is 7,000 square feet or more and requires the developer to send written notice of intent to the Town Supervisor, Town Attorney and Planning Director.
All ground-mounted systems max out at 20 feet in height at maximum tilt, must sit in side or rear yards only, and must be removed within 150 days if the system sits idle for more than 12 consecutive months.
Violations & Fines
Installing a solar energy system without the required building permit, or connecting to the grid without utility approval, is treated as a zoning violation subject to the Zoning Ordinance's enforcement provisions, including stop-work orders from the Building Inspector and required removal or bringing the installation into compliance before a Certificate of Compliance will issue.
Frequently Asked Questions
Do I need a permit for rooftop solar panels in Amherst?
Can I put ground-mounted solar panels in my front yard?
What happens if my solar system stops working?
Sources & Official References
Other rules in Amherst
New York rules heatmap·Compare Amherst to another location·View the New York solar energy overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.