Key Facts

Residential freestanding height limit
4 feet
Freestanding height, other districts
15 feet
Commercial solar height cap
20 feet
Decommissioning deadline
120 days after failure
Commercial/community site plan
required under § 44-1709
Min. lot size, commercial solar
1 acre

Summary

The City of Bloomington regulates solar panel installation under Zoning Code § 44-1031, permitting building or roof-mounted panels on any principal or accessory structure but capping freestanding residential systems at four feet and requiring site plan approval under § 44-1709 for commercial or community solar arrays. Abandoned systems must be removed within 120 days, and all wiring must be concealed or run underground.

Construction and operation of solar energy conversion facilities shall comply with all applicable local, state, and federal requirements, including but not limited to safety, construction, environmental, electrical, communications and aviation requirements. ... Any abandoned or non-functioning solar energy conversion facility shall be removed by the owner within 120 days of the day on which the system last functioned. The owner is solely responsible for removal of the system and all costs, financial or otherwise, of system removal. ... Site plan approval shall be required pursuant to § 44-1709 of this Code.

Full Breakdown

Solar energy conversion facilities in the City of Bloomington fall under Zoning Code § 44-1031, which applies to both private (residential/accessory) and commercial installations. Building or roof-mounted systems may be located on any principal or accessory structure and should be flush-mounted where possible; they may not exceed the maximum building height allowed in the zoning district, and panels may not extend beyond three feet on a pitched roof or four feet on a flat roof past the roof surface. Freestanding private systems are accessory to the principal use: in Residential Districts they are limited to the rear and side yards and capped at four feet in height, while freestanding systems in other districts may reach 15 feet, subject to the accessory-structure setbacks of § 44-908.

A community solar system serving multiple users under a recorded easement requires site plan approval under § 44-1709. Commercial solar facilities, permitted as an accessory use in the B-1 and B-2 Business Districts, need full site plan approval showing acreage, drainage, grading at two-foot contour intervals, and the location of arrays and support equipment; commercial arrays are capped at 20 feet in height and must sit on a lot of at least one acre with a 200-foot minimum width. Power and communication lines between panel banks must be buried underground unless bedrock, watercourses or distance make that infeasible, subject to the Zoning Administrator's approval.

Commercial systems within 500 feet of an airport or its approach zones must submit a Solar Glare Hazard Analysis Tool (SGHAT) study meeting FAA and Central Illinois Regional Airport Master Plan guidance. Any solar facility, private or commercial, that stops functioning must be removed by the owner within 120 days at the owner's sole cost.

Violations & Fines

Community Development enforces § 44-1031 through the zoning permit and site plan review process; installing a freestanding or commercial system without the required site plan approval, or exceeding the height and setback standards, is a zoning violation subject to a stop-work order and code enforcement citation. An abandoned system left in place beyond the 120-day removal deadline exposes the property owner to further enforcement action and the full cost of removal.

Frequently Asked Questions

Do I need a permit to put solar panels on my roof in Bloomington?
Roof-mounted systems are allowed on any principal or accessory structure without site plan approval, but they must comply with height limits under City Code § 44-1031: no higher than the district's maximum building height, and panels may not extend more than three feet past a pitched roof or four feet past a flat roof.
How tall can a freestanding solar array be in my backyard?
In Residential Districts a freestanding system in the rear or side yard is capped at four feet under § 44-1031, subsection E(2)(c); in other zoning districts the limit rises to 15 feet, measured from grade to the highest edge at maximum tilt.
Does a commercial solar farm need site plan approval?
Yes. Commercial solar energy conversion, permitted as an accessory use in the B-1 and B-2 Business Districts, requires full site plan approval under § 44-1709 showing site size, drainage, grading and equipment locations, and the facility cannot exceed 20 feet in height.
What happens if a solar system stops working and is never removed?
Under § 44-1031, subsection D, the owner must remove an abandoned or non-functioning system within 120 days of the day it last operated, and bears all removal costs; failing to do so is a code violation the City can pursue against the property owner.

Sources & Official References

Other rules in Bloomington

All Bloomington rules

Compare Bloomington to another location·View the Illinois solar energy overview

Get notified when Panel Permits in Bloomington, IL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.