Chino, CA Solar Energy: Panel Permits (2026)
Key Facts
- Roof-mounted
- Zoning clearance required
- Ground-mounted
- Administrative approval required
- Ground panel height cap
- 8 ft (multi/nonres.)
- Adopted
- Ord. 2010-05, amended 2016
Summary
Chino's zoning code requires a zoning clearance for roof-mounted solar panels and administrative approval for ground-mounted panels, with height and setback limits set in Chino Municipal Code § 20.10.070.
A.Solar panels.1.All photovoltaic solar panel systems shall meet all applicable safety and performance standards established by the National Electrical Code, the Institute of Electrical and Electronics Engineers, and other accredited testing laboratories and, where applicable, rules of the public utilities commission regarding safety and reliability.2.Roof mounted solar panels are permitted with a zoning clearance, subject to the regulations in section 20.10.070.A. Ground mounted solar panels are permitted as an accessory use with an administrative approval.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 38).
Full Breakdown
Under Chino Municipal Code § 20.10.070(A), adopted by Ord. 2010-05 and amended by Ord. 2011-06 and Ord. 2016-005, roof-mounted solar panels are permitted with a zoning clearance, while ground-mounted panels are permitted as an accessory use requiring administrative approval. Panels must meet National Electrical Code and IEEE safety standards. For multifamily and nonresidential uses, ground-mounted panels can't sit in a front setback and are capped at eight feet in height, while roof-mounted systems may rise six feet above the district's normal height limit. On single-family homes, ancillary equipment other than the panels and conduit must be screened from the front elevation, and panels should be placed where least visible from the street without materially hurting performance.
Violations & Fines
Installing solar panels without the required zoning clearance or administrative approval is a zoning code violation, enforceable the same as any unpermitted accessory structure under Title 20.
Frequently Asked Questions
Do I need a permit to install solar panels in Chino?
How tall can a ground-mounted solar array be in Chino?
Sources & Official References
Other rules in Chino
California rules heatmap·Compare Chino to another location·View the California solar energy overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Panel Permits in Nearby Cities
How other cities in San Bernardino County handle panel permits.