Washoe County, NV Solar Energy: Panel Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit issuance fee
$45.00 flat (Appendix A, Table 6)
Collector fee, up to 1,000 sq ft
$8.00
Collector fee, 1,001-2,000 sq ft
$12.00
Storage tank fee, up to 750 gal
$3.00
Electrical wiring
billed separately under Table 8
Unpermitted install penalty
2x-4x fee, up to $4,000

Summary

Washoe County requires a building permit before installing a solar energy system under Washoe County Code § 100.105.1. Fees are set by Appendix A, Table 6: $45 to issue the permit, then a tiered charge for collectors, storage tanks, and rock storage based on square footage, gallons, or cubic feet.

City-specific rules exist: Reno has its own panel permits rules that differ from Washoe County's county-level regulations. If you live in Reno, check the city-specific page instead.

100.105.1 - Required. ... shall first make application to the Building Program and obtain the required permit. TABLE 6: SOLAR ENERGY Schedule of Fees 1.For issuing each permit .....45.00 In addition: 2.For Collectors (including related piping and regulating devices) ..... Up to 1,000 sq. ft. (93 m 2) .....$8.00 Between 1,001 (93.1 m 2) and 2,000 sq. ft. (186 m 2) .....$12.00 More than 2,000 sq. ft. (186 m 2) .....$12.00 plus $1.00 per 1,000 sq. ft. (93 m 2) or fraction thereof over 2,000 sq. ft. (186 m 2). Note— These fees do not include permit fees for any parts of the solar system which are subject to the requirements of other applicable codes.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 20 Update 2).

Full Breakdown

1 requires anyone who intends to erect or install equipment regulated by the Building Code, including a solar energy system, to first apply to the Building Program and obtain a permit before work begins. 00 per additional 1,000 square feet or fraction for anything over 2,000 square feet. 00 per additional 1,000 gallons or fraction beyond 2,000 gallons. 00 per additional 1,000 cubic feet or fraction beyond 3,000 cubic feet. A note in Table 6 makes clear these fees cover only the solar equipment itself: any electrical wiring tied into the system is billed separately under Table 8's electrical permit fees, so a rooftop photovoltaic or solar water-heating installation is billed under both fee tables on the same permit application.

Violations & Fines

Installing a solar energy system without the required permit is an unlawful act under § 100.113.1 and is prosecuted as a misdemeanor, with each day of continued violation a separate offense under § 100.113.3. Starting the installation before a permit issues triggers an investigative fee equal to double the permit fee under § 100.113.3.1, which the Building Program can raise to four times the fee, up to $4,000, if a licensed contractor did the work first. The county can also issue a stop work order under § 100.114.1.

Frequently Asked Questions

How much does a solar panel permit cost in Washoe County?
Appendix A, Table 6 charges $45 to issue the permit, then $8.00 for collectors up to 1,000 square feet, $12.00 for 1,001 to 2,000 square feet, and $12.00 plus $1.00 per additional 1,000 square feet beyond that. Solar water-heating storage tanks and rock storage are billed on separate, similar tiered scales.
Do I need a separate electrical permit for solar panels?
Yes. Table 6's fee note states these charges do not include permit fees for parts of the solar system covered by other codes, so the electrical wiring connecting the system is billed under Table 8's electrical fee schedule in addition to the solar collector fee.
What code requires a permit for solar installations in Washoe County?
Washoe County Code § 100.105.1 requires anyone installing equipment regulated by the Building Code, including a solar energy system, to apply to the Building Program and obtain a permit before starting work. The system is inspected the same way as any other mechanical or electrical installation under Chapter 100.
What happens if I install solar panels without a permit?
It is a misdemeanor under § 100.113.1, and the Building Program adds an investigative fee equal to double the standard permit fee under § 100.113.3.1, which can rise to four times the fee, up to $4,000, if a licensed contractor did the installation before permitting.

Sources & Official References

Other rules in Washoe County

All Washoe County rules

Compare Washoe County to another location·View the Nevada solar energy overview

Get notified when Panel Permits in Washoe County, NV changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Panel Permits in Cities Across Washoe County