Elko County, NV Solar Energy: Panel Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified October 2026

Key Facts

Adopted code
2018 Uniform Solar, Hydronics and Geothermal Code
Fee table
Table 104.5, Solar, Hydronics and Geothermal Code Fees
Fee schedule
Set by resolution of the county commission
Special use permit threshold
Nameplate capacity of ten megawatts or more
Large project reviewer
Elko County Planning and Zoning Division
Maximum penalty
$500 fine or six months, or both

Summary

Unincorporated Elko County, Nevada adopts the 2018 Uniform Solar, Hydronics and Geothermal Code, with a fee table set by resolution of the county commission. Only renewable energy projects of ten megawatts or more need a special use permit from Planning and Zoning.

These county ordinances apply to unincorporated areas of Elko County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

(I) The 2018 Uniform Solar, Hydronics and Geothermal Code, as recommended by the International Association of Plumbing and Mechanical Officials, hereinafter referred to as the Uniform Solar, Hydronics and Geothermal Code. ... (H) Solar, Hydronics and Geothermal Code Fees: All editions of the Uniform Plumbing Code, present and future, are hereby amended and modified as follows: Table 104.5 - Solar, Hydronics and Geothermal Code Fees, the following is added: System fee schedule (note: the following do not include permit issuing fee) shall be set by resolution adopted by the Elko County commission. ... Any renewable energy project with a nameplate capacity of ten (10) megawatts or more is required to submit an application to the Elko County Planning and Zoning Division for a special use permit.

Full Breakdown

Two parts of the Elko County Code govern solar. Title 3 covers the building side. Section 3-1-1(I) adopts the 2018 Uniform Solar, Hydronics and Geothermal Code, recommended by the International Association of Plumbing and Mechanical Officials, and section 3-1-1(A) includes it in the administrative code, excluding fee schedules adopted by resolution. Section 3-1-5(H) adds to Table 104.5, Solar, Hydronics and Geothermal Code Fees, a system fee schedule that does not include the permit issuing fee and is set by resolution adopted by the Elko County commission.

The code prints no dollar amounts for the schedule, which is kept with the Community Development resolution. Section 3-1-4(A)(3) adds that permit fees are set by the Board of Commissioners and adjusted every other year using the western urban consumer price index published in January, and that property in travel zones 1, 2 and 3 pays a travel fee of $20, $40 or $60. Title 4 covers large projects. Chapter 17 requires a special use permit for construction of a renewable energy project, and § 4-17-2 sets the trigger: any renewable energy project with a nameplate capacity of ten megawatts or more must apply to the Elko County Planning and Zoning Division.

Section 4-17-3 requires a preliminary meeting with the Senior Planner and the Natural Resource director before the application, and staff consult the Nevada Department of Wildlife and other agencies. If staff find a risk of degradation to wildlife habitat, the applicant provides a report from an independent biologist. An applicant who disagrees with staff on significant impact can appeal to the Planning Commission, whose decision is final for judicial review. Section 4-17-4 lists the application contents, including the applicant's name, location, plans and layout, a reclamation plan, an environmental mitigation plan and a plan for disposal of old equipment.

Smaller systems fall under Title 3 building permits only. Section 3-1-2 adopts later editions of the solar code automatically after the building official posts notice.

Violations & Fines

Violating the adopted Uniform Solar, Hydronics and Geothermal Code or a building permit is a misdemeanor under § 3-1-7, punishable by a fine of not more than $500, imprisonment for not more than six months, or both. Each ten days of continuing violation is a separate offense when nothing else is specified, and a court can close, seal or impound the premises.

Frequently Asked Questions

Does a rooftop solar system need a special use permit in Elko County?
The special use permit in § 4-17-2 applies to a renewable energy project with a nameplate capacity of ten megawatts or more. Building permits for smaller systems fall under Title 3, which adopts the 2018 Uniform Solar, Hydronics and Geothermal Code in § 3-1-1(I).
Where do I file a large solar project application?
Applications go to the Elko County Planning and Zoning Division under § 4-17-2. Before filing, the applicant must meet with the Senior Planner and the Elko County Natural Resource director under § 4-17-3, who consult the Nevada Department of Wildlife and other agencies on wildlife effects.
What must a renewable energy application include?
Section 4-17-4 requires the applicant's name, the proposed location, proposed plans with the general layout, a land reclamation plan, a plan to mitigate environmental impacts, a wildlife mitigation plan if the preliminary meeting calls for one, and a plan for the disposal of old equipment.
Can I appeal the preliminary wildlife finding?
Yes. Under § 4-17-3(B), an applicant who disagrees that the project will significantly affect the health, safety and welfare of the public or wildlife can appeal to the Planning Commission. That determination is the final decision for purposes of judicial review.

Sources & Official References

Other rules in Elko County

All Elko County rules

Compare Elko County to another location·View the Nevada solar energy overview

Get notified when Panel Permits in Elko County, NV changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.