Farmersville, TX Solar Energy: Panel Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing section
Sec. 74-94, Farmersville Code
State authority
Tex. Util. Code §§ 31.005, 39.916
Size cap
10 MW, under 60 kV
Disconnect switch
Lockable, FE padlock required
Energizing
Barred until agreement signed, FE inspects
Study waiver
Pre-certified units under 20 kW AC
Buy-back rate
Set in city master fee schedule

Summary

Farmersville requires anyone installing a distributed generation system, including rooftop solar, to file and receive approval on a formal interconnection application with Farmersville Electric before tying into the city grid. The system must pass an FE inspection, cannot be energized until the agreement is signed, and is capped at 10 megawatts with a required manual disconnect switch.

(1)Intent. This section is intended to provide for the orderly, safe and effective interconnection and parallel operation of distributed generation facilities within the city electric system by customers of Farmersville Electric (FE). ... (5)Application and agreement required means:a.Before a person or entity may interconnect or operate in parallel with a distributed generation system within FE's electric system, that person or entity must complete and submit the "Application for the Interconnection and Parallel Operation of Distributed Generation with the Farmersville Electric Utility System" provided by FE. This form establishes the terms and conditions for the interconnection and parallel operation of the distributed generation system. ... c.The interconnection shall not be energized prior to the execution of the agreement and FE inspection as required herein.

Full Breakdown

Under Sec. 916. Distributed generation is defined as a facility of 10 MW or less connected below 60 kV. Before energizing a system, the customer must submit the "Application for the Interconnection and Parallel Operation of Distributed Generation with the Farmersville Electric Utility System," and the installation cannot go live until FE executes the agreement and completes its inspection. FE requires a manual load-break disconnect switch, mounted separately from the meter, lockable with an FE padlock and reachable by FE staff at all times; FE can open it to isolate the system during maintenance, an emergency, or if the system is operating unsafely or affecting other customers.

Technical standards cover voltage deviation limits (automatic disconnection within 10 cycles for swings beyond plus 5/minus 10 percent sustained 30 seconds), frequency deviation (plus one-half or minus seven-tenths Hz), harmonic distortion capped at 5 percent THD under IEEE 519, and power factor held between 97 percent lagging and leading. A full paid interconnection study is waived only if the equipment is pre-certified (UL 1741-listed inverter with UL 1703 PV modules under 20 kW AC), the system will not export more than 15 percent of feeder load, and it will not contribute more than 25 percent of feeder fault current.

FE pays the customer for net excess metered kWh output at the distributed-generation buy-back rate set in the master fee schedule by the city council.

Violations & Fines

A system energized without a signed interconnection agreement and FE inspection is out of compliance, and FE may open the disconnect switch to isolate it from the grid at any time for safety, power-quality, or codes noncompliance under Sec. 74-94(b)(2). Continued unauthorized parallel operation or metering interference exposes the customer to prosecution for theft of utility service and other charges under Sec. 74-93 and applicable state law, in addition to reconnection and study fees billed under the master fee schedule.

Frequently Asked Questions

Do I need city approval to put solar panels on my house in Farmersville?
Yes. Before connecting any distributed generation system to the grid you must submit FE's interconnection application, sign the resulting agreement, and pass an FE inspection. Sec. 74-94 bars energizing the system before that inspection and agreement are complete, regardless of the panel size.
Can Farmersville Electric shut off my solar system?
Yes. FE can open your required manual disconnect switch to isolate your generating equipment from its system for maintenance, emergencies, unsafe operation, effects on other customers, or your failure to follow the codes or your interconnection agreement, per Sec. 74-94(b)(2).
Will I have to pay for an engineering study before I can connect?
Not if your equipment is pre-certified: a UL 1741-listed inverter under 20 kW AC with UL 1703 PV modules, exporting no more than 15 percent of feeder load and no more than 25 percent of feeder fault current. Outside those limits, FE performs a study at your expense.
Does Farmersville pay for excess solar power I send back to the grid?
Yes. FE credits metered kWh you export beyond your own consumption at the distributed-generation buy-back rate, which the city council sets and can modify in the master fee schedule in appendix A of the Code.

Sources & Official References

Other rules in Farmersville

All Farmersville rules

Texas rules heatmap·Compare Farmersville to another location·View the Texas solar energy overview

Get notified when Panel Permits in Farmersville, TX changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Panel Permits in Nearby Cities

How other cities in Collin County handle panel permits.

McKinney, TX
Light Restrictions
Plano, TX
Light Restrictions
Allen, TX
Few Restrictions
Frisco, TX
Few Restrictions