Hendricks County, IN Solar Energy: Panel Permits (2026)
Key Facts
- Ground mount review fee
- $75 application review
- Ground mount inspections
- $50 each x3, $150 total
- Roof mount fee
- $100 flat filing/inspection
- Commercial solar fee
- $300 review + $500 inspections
- Permitting office
- County Planning and Building Dept.
- Unpermitted work fine
- $10-$200 per day
Summary
Hendricks County requires an application review and inspection permit before installing ground mounted or roof mounted solar panels, priced on the Planning and Building Department's uniform fee schedule at Code § 37.25(D). A ground mounted array costs $75 to review plus $150 in footing, electric and final inspections; a roof mounted system pays one flat $100 filing and inspection fee.
Ground Mounted Solar Panels Application Review Fee $75 Ground Mounted Solar Panels Inspection Fees Footing $50 Electric $50 Final $50 Roof Mounted Solar Panels Application Filing Fee / $100 Inspection Fee
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2025 S-3: Supplement contains: Local legislation current through Ord. 2024-50, passed 12-10-2024; and State law current through Indiana Legislative Service, 2025 Acts, Pamphlet No. 3).
Full Breakdown
The County Planning and Building Department administers solar permitting through the Uniform Schedule adopted at § 37.25(D). A ground mounted system pays a $75 application review fee, then three separate $50 inspections, for footing, electric work and the final sign off, adding $150 in inspections on top of the review fee for a $225 total. A roof mounted array is instead billed a single combined $100 filing and inspection fee rather than itemized inspection stops. A larger, non-residential installation, listed separately as a Generator/Solar Grid/Wind Generator, is billed a $300 application review fee plus five $100 inspections covering footing, foundation, rough-in, bonding and final.
Beyond the fee table, the county's general Building Regulations chapter controls how that permit is obtained. Section 150.40(B) requires that a permit be obtained before beginning construction, alteration, repair or placement of any structure, with every permit issued by the Building Commissioner out of the Planning and Building Department. Section 150.41 directs the Building Commissioner to review every application for compliance before issuance, and § 150.42 requires staged inspections of the work as it proceeds, with reinspection required if the work is not ready when the inspector arrives. If a solar installation goes up without the required review, § 150.44 lets the Building Commissioner issue a written stop work order halting construction until the county authorizes it to resume.
This fee schedule does not set panel height, property-line setback, or ground coverage limits for solar arrays; those siting standards sit in the county's separate Zoning Ordinance, which is not part of this general code chapter.
Violations & Fines
Installing solar panels without the required permit, or contrary to the reviewed plans, is unlawful under § 150.47 and fined under § 150.99(C): not less than $10 nor more than $200, with each day of continued unpermitted work counted as a separate offense. The Building Commissioner can also issue a written stop work order under § 150.44, halting construction until the permit and inspections are brought current.
Frequently Asked Questions
Does Hendricks County require a permit for rooftop solar panels?
What does a ground mounted solar array cost to permit?
Who issues solar permits in the county?
What happens if I install panels without a permit?
Does the fee schedule cover where I can put the panels on my lot?
Sources & Official References
Other rules in Hendricks County
Compare Hendricks County to another location·View the Indiana solar energy overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.