Issaquah, WA Solar Energy: Panel Permits (2026)
Key Facts
- Section
- CAC 105.2, item 26, in IMC 16.04.010
- Installer
- Licensed contractor required
- Height above roof
- No more than 18 inches
- Dead load
- No more than 4.0 pounds per square foot
- Electrical permit
- Approved and issued electrical permit required
- Eligible buildings
- Detached one- or two-family dwelling, townhouse up to three stories, or detached accessory structure
Summary
Issaquah exempts rooftop photovoltaic panels from the building permit only when every criterion in item 26 of section 105.2 is met, including a licensed installer, panels mounted no higher than 18 inches above the roof, and a dead load of no more than 4.0 pounds per square foot. The system must still have an approved and issued electrical permit.
26. Photovoltaic (PV) panels meeting all of the following criteria: a. PV system is designed and proposed for a detached one- or two-family dwelling or townhouse not more than three stories above grade or detached accessory structure. b. PV system is being installed by a licensed contractor. c. Mounting system is engineered and designed for PV. ... e. Panels are mounted no higher than 18 inches above the surface of the roofing to which they are affixed. Except for flat roofs, no portion of the system may exceed the highest point of the roof (or ridge). f. Total dead load of panels, supports, mountings, raceways, and all other appurtenances weigh no more than 4.0 pounds per square foot. ... j. Home is code compliant to setbacks and height, or code allows expansion of nonconformity for solar panels. ... m. The PV system has an approved and issued electrical permit.
Full Breakdown
Item 26 of the building list in section 105.2 of the Construction Administrative Code (IMC 16.04.010) applies only to PV systems designed for a detached one- or two-family dwelling or townhouse not more than three stories above grade, or a detached accessory structure. Every criterion must be met. The system must be installed by a licensed contractor, with an engineered mounting system designed for PV, on a roof made from lightweight material such as a single layer of composition shingles, metal roofing or cedar shingles.
The physical limits are numeric. Panels are mounted no higher than 18 inches above the roofing surface, and except on flat roofs no portion of the system exceeds the highest point of the roof or ridge. Total dead load of panels, supports, mountings, raceways and all other appurtenances weighs no more than 4.0 pounds per square foot, and supports spread the load across as many roof-framing members as needed so that no point carries a load over 50 pounds. Roof and wall penetrations must be flashed and sealed, the installation must follow the manufacturer's instructions, and the system must comply with International Residential Code Section R324. Roof-mounted collectors and supports must be noncombustible or fire-retardant-treated wood equivalent to that required for the roof construction.
The home must be code compliant to setbacks and height, or the code must allow expansion of a nonconformity for solar panels. The last criterion, m, requires that the PV system has an approved and issued electrical permit, so the exemption removes the building permit and not the electrical one.
Section 105.2 also excludes areas of flood hazard and City land use critical areas from every exemption unless the work is entirely within or on the exterior envelope of a legally established existing building. IMC 16.04.020 separately adopts IRC Appendix T, Solar-Ready Provisions, and section 107.2.12 requires electrical plans to be submitted when the Building Official determines they are needed to show compliance.
Violations & Fines
A violation of the construction codes chapter is a civil violation enforced under Chapter 8.45 IMC (IMC 16.04.130). Because the exemption is conditional, an installation that misses any one criterion loses it and needs a permit; starting without one triggers the special investigation fee in section 109.5, collected whether or not a permit is later issued. Illegal work remaining 60 days past the posting of a Stop Work Order is considered hazardous and subject to abatement.
Frequently Asked Questions
Do I need a building permit for rooftop solar in Issaquah?
Do solar panels still need an electrical permit?
Can panels extend above the roof ridge?
Does the solar exemption apply in a flood hazard or critical area?
Sources & Official References
Other rules in Issaquah
Compare Issaquah to another location·View the Washington solar energy overview