Skip to main content
CityRuleLookup

Lynnwood, WA Solar Energy: Panel Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Standard permit fee
$228.00 (checklist path)
Valuation basis
Structural and labor only
Non-checklist fee
Based on building valuation table
Governing table
LMC 3.104.160
Fee period
2026 schedule
Stop-work fee
Equal to original permit fee

Summary

Lynnwood charges a flat $228.00 permitting-checklist fee for a single-family solar energy system that meets the city's standard requirements, under the Table 3.104.160 building fee schedule. Valuation for that flat fee is based on structural components and labor only, not the value of the panels or inverters themselves.

NOTE: For single-family residential solar energy systems, valuation shall be based on structural components and labor only. ... | Solar System, Single-Family | Per permitting checklist | $228.00 |

View official code

Official source re-checked September 8, 2026: no newer edition of the code had been published (publisher’s edition: current through Ordinance 3512, passed May 26, 2026).

Full Breakdown

160 'LMC Title 16 fees and charges,' sets Lynnwood's building, single-family, electrical and grading permit fees for construction valued under the International Code Council Valuation Data Table or the International Building Code's square-footage method, whichever is greater. For solar work, the table carves out a specific note: 'For single-family residential solar energy systems, valuation shall be based on structural components and labor only,' which keeps the taxable job value, and therefore the fee, from ballooning with the retail cost of panels and equipment. 00 fee rather than being run through the sliding valuation table used for other construction.

00 and rises with construction value. 27 RCW, which supplies the underlying construction standards a solar installer must still meet for structural attachment and electrical work.

Violations & Fines

Lynnwood's building permit fees are collected at application under LMC 3.104.160, and installing a solar energy system without the required building and electrical permits exposes the installer or owner to the code's general permit-enforcement remedies, including stop-work orders; the fee schedule separately charges an amount equal to the original permit fee for an investigation into work done under a stop-work order.

Frequently Asked Questions

How much does a solar panel permit cost in Lynnwood?
A single-family solar energy system that follows the city's standard permitting checklist is charged a flat $228.00 fee under the Table 3.104.160 building fee schedule, separate from the sliding valuation table used for most other construction.
Does Lynnwood charge the permit fee based on the cost of my solar panels?
No. The fee schedule specifically states that valuation for single-family residential solar energy systems shall be based on structural components and labor only, so the retail price of the panels and inverter is not factored into the fee.
What if my solar project doesn't meet the standard permitting checklist?
A single-family or commercial system that does not meet the permitting checklist requirements is charged a fee based on the building permit valuation table, the same tiered schedule used for regular building permits, which can run well above the flat $228.00 checklist fee.

Sources & Official References

Other rules in Lynnwood

All Lynnwood rules

Compare Lynnwood to another location·View the Washington solar energy overview

Get notified when Panel Permits in Lynnwood, WA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Panel Permits in Nearby Cities

How other cities in Snohomish County handle panel permits.

Marysville, WA
Some Restrictions