Skip to main content
CityRuleLookup

Oklahoma City, OK Solar Energy: Panel Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Electrical permit fee
$108-$120
Building permit fee
$86.40-$96
Permit must be pulled by
Licensed, City-registered contractor
Enforced by
Chief Electrical Inspector
First violation
Class "a" offense

Summary

Installing solar panels in Oklahoma City requires an electrical permit under the Electrical Code before any wiring starts, plus a separate building permit for the mounting system, each with its own City fee.

Permits shall be required for any interior or exterior electrical wiring, or any electrical construction, electrical installation, or alteration of any electrical wiring, equipment apparatus or fixtures. Prior to commencement of any electrical installation, the electrical contractor shall contact the Development Services Department and obtain a permit. The permit shall be numbered, listing the name of the contractor, job address, building permit number, and scope of the electrical installation proposed. When the permit is requested electronically, or by telephone, the contractor's copy shall be sent electronically or mailed to the business address. The permit covers only that work listed thereon. Any additions or changes shall be reported to the Development Services Department and additional inspection fees may be assessed prior to requesting final inspection. Electrical permits shall be transferable.

Source: Oklahoma City Code of Ordinances Chapter 18 – Electrical Code (solar panel permits)View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 5 Update 1).

Full Breakdown

Any photovoltaic installation counts as electrical work under the Electrical Code, so it needs a permit before installers touch a wire. Oklahoma City Municipal Code § 18-36 requires the permit be pulled in the property owner's name by a State-licensed, City-registered electrical contractor: homeowners can't self-permit the wiring, only a meter-base swap. The Development Services Department issues the permit and the Chief Electrical Inspector inspects the work. Solar arrays also draw a separate building permit. Fee schedule item § 60-18-26(h) sets the electrical permit fee for 'photovoltaic installations (solar)' at $108 through June 30, 2026, rising to $120 on July 1, 2026; § 60-12-10(i) adds an $86.40-$96 building permit fee.

Violations & Fines

Starting electrical work on a solar array without a permit is a Class "a" municipal offense under § 18-25(a), escalating to a Class "b" offense for a repeat violation, plus possible stop-work and reinspection fees.

Frequently Asked Questions

Do I need a permit to install solar panels in Oklahoma City?
Yes. Photovoltaic work counts as electrical work, so § 18-36 requires a permit from a State-licensed, City-registered contractor before installation, plus a separate building permit for the mounting system.
Can I pull the solar permit myself as the homeowner?
No. The electrical permit must be obtained through a State-licensed, City-registered electrical contractor in the owner's name; residents can only self-permit a meter base with no wiring work.
How much does an Oklahoma City solar permit cost?
The electrical permit fee for photovoltaic installations is $108 through June 30, 2026, rising to $120 after, per § 60-18-26(h): plus a separate building permit fee of $86.40-$96 under § 60-12-10(i).

Sources & Official References

Other rules in Oklahoma City

All Oklahoma City rules

Compare Oklahoma City to another location·View the Oklahoma solar energy overview

Get notified when Panel Permits in Oklahoma City, OK changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Panel Permits in Nearby Cities

How other cities in this county handle panel permits.

Midwest City, OK
Some Restrictions