Kane County, IL Solar Energy: Panel Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Non-commercial solar fee
$5.00 per kW, $100 minimum
Commercial solar fee
$5,000/MW, capped at $75,000
Low-voltage solar device fee
No fee (under 50 volts)
Permitting agency
Building & Community Services Division
Permit lapse
Expires after 2 years if incomplete
Citation
Kane County Code § 6-12(U)

Summary

Unincorporated Kane County requires a building permit for any roof-mounted or ground-installed solar-electric system sized to power the property itself, billed under the county Fee Schedule at $5.00 per kW of nameplate capacity or a $100 minimum, whichever is greater. Low-voltage solar devices under 50 volts pay no fee at all.

City-specific rules exist: Aurora, and Elgin have their own panel permits rules that differ from Kane County's county-level regulations. If you live in one of those cities, check the city-specific page instead.

3. Non-Commercial Solar Energy System: a. Definition: Any device or assembly of devices that (i) is ground installed or roof-mounted and (ii) uses solar energy from the sun for generating electricity primarily for consumption on the property on which the device or devices reside. This term does not include any device that is a "Low-Voltage Solar-Powered Device" under this section. b. Fee: Five dollars ($5.00) per each kW of nameplate capacity of the energy system, or a one hundred dollar ($100.00) minimum fee, whichever is greater. 4. Low-Voltage Solar-Powered Device: a. Definition: A piece of equipment designed for a particular purpose, including, but not limited to, doorbells, security systems, and illumination equipment, powered by a solar collector operating at less than fifty (50) volts, and located: (i) entirely within the lot or parcel owned by the property owner; or (ii) within a common area without being permanently attached to common property. b. Fee: No fee.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2026 S-17: Code current through: Ord. 26-183, passed 4-14-2026).

Full Breakdown

Kane County Code Chapter 6, the Fee Schedule, sets a dedicated line item for residential and small-scale solar under Section 6-12(U)(3), "Non-Commercial Solar Energy System": any device or assembly that is ground installed or roof-mounted and generates electricity primarily for on-site consumption. 00 per kW of nameplate capacity, or a $100 minimum fee, whichever is greater, separate from the "Commercial Solar Energy Facility" track in the same subsection, which is billed $5,000 per megawatt up to a $75,000 cap and additionally requires a Special Use Permit before any Commercial Solar Energy Building Permit issues.

A homeowner adding rooftop or backyard panels for their own use falls under the non-commercial fee, not the special-use process built for utility-scale solar farms. The code also carves out a true no-fee category: a "Low-Voltage Solar-Powered Device" under Section 6-12(U)(4), such as a solar doorbell, security light, or illumination fixture powered by a collector under 50 volts and kept entirely on the owner's lot, pays no permit fee. 1). 5, a building permit, including a solar permit, expires two years after issuance if the work is not completed, forcing the owner to obtain a new permit for the remaining work; solar is not among the categories (swimming pools, decks, accessory structures, electric service, and similar work) singled out for the shorter 180-day expiration, so the standard two-year clock governs a solar installation left unfinished.

Violations & Fines

There is no separate solar-specific penalty; Kane County enforces solar permits through its standard Building Code administration. Kane County Code Section 6-2 (amending IBC Section 105.5) provides that after two years, if the work is not completed, the permit expires and a new permit is required for all remaining work. The Building & Community Services Division, designated the Department of Building Safety under Section 6-2's amendment to IBC Section 103.1, reviews plans and inspects the installation before a solar permit is closed out.

Frequently Asked Questions

Do I need a permit to put solar panels on my house in unincorporated Kane County?
Yes. Kane County Code Section 6-12(U)(3) treats any ground-installed or roof-mounted solar-electric system used mainly to power the property as a Non-Commercial Solar Energy System requiring a building permit, billed at $5.00 per kW of nameplate capacity with a $100 minimum fee.
How is the Kane County solar permit fee calculated for a home system?
The fee is $5.00 per kW of nameplate capacity, or $100, whichever is greater, under Kane County Code Section 6-12(U)(3). That is far below the commercial track, which charges $5,000 per megawatt up to a $75,000 cap for utility-scale solar facilities.
Is a solar-powered doorbell or yard light exempt from a Kane County permit fee?
Yes. Kane County Code Section 6-12(U)(4) defines a Low-Voltage Solar-Powered Device, such as a doorbell, security system, or illumination fixture powered by a collector under 50 volts and kept on the owner's lot, and charges it no fee.
What happens if my Kane County solar permit expires before the installation is finished?
Under Kane County Code Section 6-2's amendment to IBC Section 105.5, a building permit expires two years after issuance if the work is not completed, and the owner must obtain a new permit to finish the remaining installation work.

Sources & Official References

Other rules in Kane County

All Kane County rules

Compare Kane County to another location·View the Illinois solar energy overview

Get notified when Panel Permits in Kane County, IL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.