Skip to main content
CityRuleLookup

Sterling Heights, MI Solar Energy: Panel Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Roof-mount height cap
10 ft above finished roof
Ground-mount height cap
15 ft (10 ft small lots)
Ground-mount lot coverage
20% of parcel max
Approval required under
§ 29.02 permits section
Barred in
P-1 district, floodplain

Summary

Roof-mounted solar panels are a permitted accessory use in every Sterling Heights zoning district, capped at 10 feet above the finished roof at maximum tilt, but still require approval under the zoning ordinance's permits section.

Roof-mounted solar energy systems are permitted as accessory structures in all zoning districts, on both residential and non-residential buildings, including principal buildings and accessory buildings, subject to approval in accordance with Section 29.02 and the following requirements: a. Roof-mounted solar energy systems shall not exceed 10 feet above the finished roof when oriented at maximum tilt and are exempt from any roof-mounted appliance or fixture screening requirements.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2026 S-46: Local legislation current through Ord. 509, passed 5-19-26).

Full Breakdown

Zoning Ordinance § 28.00.J.2 allows roof-mounted solar energy systems as accessory structures on any building, residential or non-residential, in every zoning district, but only 'subject to approval in accordance with Section 29.02,' the ordinance's building/zoning-compliance permit section. Panels can't rise more than 10 feet above the finished roof at maximum tilt, though they're exempt from the screening rules that apply to other roof-mounted equipment. Ground-mounted systems (§ 28.00.J.3) face tighter rules in Macomb County's Sterling Heights: a 15-foot height cap (10 feet on quarter-acre-or-smaller residential lots), a 20% lot-coverage limit, and a 3-foot rear-yard setback in the R-60 through R-100 districts; they're barred outright in the P-1 parking district and floodplain areas.

Violations & Fines

Installing a solar array without the required zoning approval, or exceeding the height, coverage or setback limits, is a violation under § 33.00.B, with fines up to $500 per day, up to 90 days imprisonment, or both.

Frequently Asked Questions

Can I put solar panels on my roof in Sterling Heights?
Yes, in any zoning district, § 28.00.J.2 permits roof-mounted solar as an accessory use up to 10 feet above the finished roof, subject to approval under the ordinance's § 29.02 permit process.
Are ground-mounted solar panels allowed?
Yes in most districts, but not in the P-1 parking district or floodplain areas; § 28.00.J.3 caps height at 15 feet (10 feet on small residential lots) and coverage at 20% of the lot.

Sources & Official References

Other rules in Sterling Heights

All Sterling Heights rules

Compare Sterling Heights to another location·View the Michigan solar energy overview

Get notified when Panel Permits in Sterling Heights, MI changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.