Travis County, TX Solar Energy: Panel Permits (2026)

Few Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified April 2026

Key Facts

Permit
Electrical required
NEC
2017 adopted
AE VoS
~9.7 cents/kWh
PEC
Net metering retail

Summary

Rooftop solar installations in unincorporated Travis County require an electrical permit from Development Services (typical fee $150-250) and must comply with 2017 National Electrical Code as adopted. Structural engineering review required if panels add over 5 PSF to existing roof. Austin Energy and Pedernales Electric Cooperative both offer solar rebates and net metering.

City-specific rules exist: Austin has its own panel permits rules that differ from Travis County's county-level regulations. If you live in Austin, check the city-specific page instead.

Sec. 202.010. REGULATION OF SOLAR ENERGY DEVICES. (a) In this section:(1) "Development period" means a period stated in a declaration during which a declarant reserves:(A) a right to facilitate the development, construction, and marketing of the subdivision; and(B) a right to direct the size, shape, and composition of the subdivision.(2) "Solar energy device" has the meaning assigned by Section 171.107, Tax Code. The term includes a solar roof tile.(b) Except as otherwise provided by Subsection (d), a property owners' association may not include or enforce a provision in a dedicatory instrument that prohibits or restricts a property owner from installing a solar energy device.(c) A provision that violates Subsection (b) is void.

Source: Austin Energy SolarView official code

Full Breakdown

Austin Energy Value of Solar tariff pays approximately 9.7 cents/kWh for residential generation. PEC offers simple net metering at retail rate. Interconnection agreement required before system activation. Ground-mount systems larger than 200 sf trigger building permit review. Battery storage systems require separate permit under 2017 NEC 706.

Violations & Fines

Unpermitted solar installation: $500 per day plus mandatory electrical inspection. Unsafe installations red-tagged and de-energized. Fire risk from improper rapid shutdown.

Frequently Asked Questions

Do I need a permit for rooftop solar in Travis County?
Yes: electrical permit from Development Services, plus utility interconnection agreement.

Sources & Official References

Other rules in Travis County

All Travis County rules

Texas rules heatmap·Compare Travis County to another location·View the Texas solar energy overview

Get notified when Panel Permits in Travis County, TX changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Panel Permits in Cities Across Travis County